Message ID: 35     Entry time: Wednesday, September 07, 2011, 15:40
Author: Anders Mjos 
Target Material: Empty 
Target Oven W.O#:  
Source:  
Status: Maintenance 
Subject: Re-sealing of Glove Box 

2011-09-01:

  • Glove box was leaking (air/argon) between base and box. Light was shining through.
  • Removed old neoprene seal at base.
  • Resealed glove box between base and box with DAP Butylflex. No light shining through after repair.
  • Replaced rubber disks at 4 feed-throughs.
  • Maico Dalla Valle replaced the inner ring on the glove ports. See dwg ITA2954 and ECO-2418.
  • After the repair, the glove box has a significantly reduced leak, estimated to a few liters per minute at an air pressure of  0.5" H2O.

Evaporator drawings can be found on ITA2900D

Work Permit: 2011-09-01-2 