Tuesday, April 02, 2013, 17:25
UO2/C green was prepared on Mar 11, 2013.
UO2 powder used = 50.32g (Inventory R-00835A UO2 + bottle = 896.16
Graphite powder used = 10.00g
The green was rolled and wrapped in a piece of graphite sheet
The target boat was wrapped with 3 -Ta heat shields and installed in the Evap#1.
The chamber is currently being pumped down.
The target will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Wednesday, April 03, 2013, 11:28
IG1 currently at 3.56e-6 Torr, BP at 28mTorr.
Tabbing up TGHT to 50A.
After 20 mins, IG got up to 7.5e-5 torr (tripping at 8e-5 Torr). Lower TGHT to 20A.
Initiated autoramping...
Monday, April 15, 2013, 14:33
The domestic water will be shut off tomorrow, April 16 at 07:00 for ARIEL work. The evaporator cooling water will be shut off; therefore the process must stop for now.
TGHT is current at 315.5A, IG1 at 5.2e-5 Torr.
Cooling down at 1A/min.
Tuesday, April 16, 2013, 16:28
The cooling water is back online. The carbonization process will continue...
TGHT will be ramped up to 300A at 2A/min. Then the ramping rate will changed to 0.1A/min to have TGHT reach to 520A.
IG is currently at 1.2e-6 Torr.
Wednesday, April 17, 2013, 10:53
TGHT continues to ramp at 0.1A/min.
Sunday, April 21, 2013, 22:11
The synthesis of UC2 is complete.
Auto cooling is initiated. Ramping down at 1A/min.
The chamber will be vented with Ar tomorrow.
|