Thursday, September 07, 2017, 11:00 -12:00
The roughing pump was disconnected from Evaporator 1, along with the exhaust/ventilation. No contamination was found on swipes.
The oil was refilled.
The roughing pump was then moved away from the PLC to allow access for Dave Morris. The RP can be reconnected and tested after the PLC work is complete.
Work permit # I2017-09-07-1
|