Tuesday, June 25, 2013, 14:35
UO2/C green was prepared on June 18, 2013 and let dry over the weekend.
UO2 powder used = 50.25g (Inventory R-00835A UO2 + bottle = 845.94g - before use)
Graphite powder used = 10.0g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with a 3-Ta heat shields and installed in the Evap#1 on June 24, 2013
The chamber has been pumped down
IG1 currently at 4.6E-06 torr
Target will be ramped up to 520A at the rate of 0.1A/min
Vacuum limit stop at 5.0E-05 torr, backing off at 6.0E-05 torr
|