Entry  Thursday, May 30, 2013, 16:25, John Wong, UC2, 39165-6, LP-SIS, Done, Conditioning UCx#06 UCx#6_conditioning_stage1.PNG
    Reply  Wednesday, June 05, 2013, 16:52, Laura Lambert, UC2, 39165-6, LP-SIS, Done, Conditioning UCx#06 UCx#6_conditioningstage1.PNG
       Reply  Thursday, June 06, 2013, 16:56, John Wong, UC2, 39165-6, LP-SIS, Done, Conditioning UCx#06 UCx#6_final_conditioning.PNG
Message ID: 67     Entry time: Thursday, June 06, 2013, 16:56     In reply to: 66
Author: John Wong 
Target Material: UC2 
Target Oven W.O#: 39165-6 
Source: LP-SIS 
Status: Done 
Subject: Conditioning UCx#06 

Laura Lambert wrote:

John Wong wrote:

Thursday, May 30, 2013, 16:16

The target container was previously coated with TaC and sintered in Evap 2.

The target is loaded with 250 discs of UCx (material from batch#03_02042013)

Total length = 8.9cm

The container is wrapped with 3 layers of Ta-heat shield, including the back block.

A regular TaC coated/sintered endcap is inserted on left, wrt to the ionizer tube pointing out of the page.  The right end is open with no cap. 

(Did not use a D-cap... trying out this method.  Need to be careful when handling the target!)

The chamber is dumping down.


 Instructions for conditioning the UCx target:

1.  TGHT will need to heat up to ~175A to burn off the organics. 

      Parameter setup:  5.0e-5 good vac, 6.0-5 bad vac.  The auto-ramping rate is set to 0.1A/min.

2.  Once the organics have burnt off, ramp down the TGHT to 0A at 2A/min.

3.  Purge the glovebox with argon gas. 

4.  Vent the chamber with Ar gas.  Close the valve when it is completely vented.

5.  Remove the target.  Be careful the left end (view from the top) is open with the D-cap. 

6.  Clean the chamber with TCE and remove all the gunge.

7.  Install the target back

8.  Pump down the chamber to at least low 10e-6 Torr before begin the final carbonization process.

9.  Auto-ramp the TGHT current to 175A at 1A/min.

10.  Once the TGHT reach to 175A.  Auto-ramp TGHT to 520A at 0.1A/min.

11.  At 520A, keep heating the target for at least 4-5 hours.

12.  Auto ramp TGHT to 0A at 2A/min.

13.  Purge the glovebox with argon for at least 5 min

14.  Vent the chamber with argon gas.  Close the vavle when it is completely vented.

15.  Remove the target from the chamber and put in the "orange box" and transport to the Ar-glove box.

Done!


 Friday, May 31, 2013, 18:17

Chamber has pumped down to 6.7e-6 Torr. 

Ramping up TGHT to 175A.


 Wednesday, June 05, 2013, 11:14

TGHT reached to 227A/1.99V. (see attachment#1)

TGHT is ramping down to 0A  to clean up the chamber before continue with the conditioning.


 

 

 Wednesday, June 05, 2013, 16:45

Glove box purged with Ar, ~30min

Chamber vented with Ar

Target removed. chamber cleaned with TCE.

Chamber pumped back down

IG1 currently at 1.4E-4 torr

See attachment 1 before chamber was cleaned


 


 

Thursday, June 06, 2013, 11:38

Chamber has been pumped down overnight

IG1 currently at 4.7E-06 Torr, BP at 30 mTorr

TGHT will be ramped up to 220A at 1A/min


 

 Thursday, June 06, 2013, 16:53

TGHT has reached to 220A; continue ramping up to 520A at 0.1A/min rate.


 Monday, June 10, 2013, 12:28

TGHT has reached to 520A; target has been heated at the current over the weekend.

IG is stabilizing at 3.7e-6 Torr. 

Initiating auto-cooling to 0A at 2A/min.

Chamber will be vented in Ar tomorrow.


 Monday, June 10, 2013, 17:50

TGHT reached to 0A. See attachment #1 for the overall process. 


 

Attachment 1: UCx#6_final_conditioning.PNG  23 kB  Uploaded Monday, June 10, 2013, 18:51  | Show | Hide all