Message ID: 285     Entry time: Wednesday, October 19, 2022, 12:28
Author: Darwin Ortiz Rosales 
Target Material: UC2 
Target Oven W.O#: 40253-5 
Source: LP TUBE 
Status: Done 
Subject: C-220510 further conditioning 

Wednesday, October 19, 2022, 10:27

Cartridge-220510Cx was installed in the EVAP1 and pumped down yesterday.

Material will be further conditioned at 450A for 4 hours.

The material will be conditioned inside a container tube with both ends open at the ends.  Two springs are inserted at the ends of the graphite cartridge to contain the material as graphite caps not inserted.

IGP1 = 7.8e-07 Torr

 

Good vacuum = 5e-4 Torr

Bad vacuum = 5e-2 Torr

 

Will autoramp @2A/30s (4A/min) to 40 A and then to 120A.  Fast ramp rate because material had previously been conditioned


 

Wednesday, October 19, 2022, 12:23

TGHT 450A, 5.2 V

Will leave for 4 hours and then begin ramp-down.


Wednesday, October 19, 2022, 16:21

IGP1= 3.1e-06Torr

450A, 5.2V

Start rampdown @- 2A/min


Thursday, October 20, 2022, 09:23

IGP1= 4.6e-7 Torr

 