Wednesday, April 30, 2014, 14:50
The target container was previously coated with TaC and sintered in Evap 2.
The target is loaded with 250 discs of UCx (material from batch#09_06022014)
Total length = 9.3cm
The container is wrapped with 3 layers of Ta-heat shield, including the back block.
A regular TaC coated/sintered endcap is inserted on left, wrt to the ionizer tube pointing out of the page, so the right end is open with no cap to allow out-gassing.
(Did not use a D-cap... This worked for UCx#8. Need to be careful when handling the target!)
The chamber is being dumping down.
TGHT will be ramped up to 520A - keep heating at that current for ~4 to 5 hours.
Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac. The auto-ramping rate is set to 0.1A/min.
Wednesday, April 30, 2014, 16:41
Vacuum at 1.5 e-5 Torr. Stepped up TGHT to 25A.
Wednesday, April 30, 2014, 17:42
Pressure 9.2 e-6 Torr. Initiate auto-heating.
Friday, May 16, 2014, 16:02
Conditioning complete. (see attachment)
End-caps need to be expended before assembly.
|