Tuesday, March 04, 2014, 15:43
Theses endcaps (4) were previously sinterred in Evap#2 but some surfaces were not fully sinterred. (See Evaporator2 E-log ID119: https://elog.triumf.ca/TIS/Evaporator_2/119)
The endcaps are inserted in a target boat wrapped with 3 heat-shields.
Chamber is currently being pumped down.
TGHT will be rampped up to 580A and heat for >4hrs.
|