Tue May 10 14:56:05 2011: Target is wrapped with 3 heat-shields. The evaporator is pumping down, vac @ 4.72e-6 Torr. TGHT was raised to 60A/0.239V. Auto heating will being now; THGT will be ramped up to 820A @ 2A/min. (See Attachment#1: Staring_process)
Wed May 11 10:16:03 2011: Auto cooling was started by ISAC Ops' help. TGHT has ramped down to zero. The p/s will be turned off and the evaporator will be vented soon. (See Attachment#2: Overall Process).
|