Entry  Monday, September 12, 2016, 17:41, John Wong, , , TARGET BOAT, In progress, RUSH. Sintering end-caps  
    Reply  Tuesday, September 20, 2016, 10:49, Laura Lambert, , , TARGET BOAT, Done, RUSH. Sintering end-caps  Evernote_Camera_Roll_20160919_154129.jpgEvernote_Camera_Roll_20160919_154130.jpgEvernote_Camera_Roll_20160919_154131.jpgEvernote_Camera_Roll_20160919_154132.jpg
Message ID: 135     Entry time: Monday, September 12, 2016, 17:41     Reply to this: 136
Author: John Wong 
Target Material:  
Target Oven W.O#:  
Source: TARGET BOAT 
Status: In progress 
Subject: RUSH. Sintering end-caps  

Monday, September 12, 2016, 17:30

A bunch of end caps (12?) and a long Ta-wire in spring sharp  were coated with TaC coating and wrapped in a small sheet of graphite foil. 

Container is then wrapped with a sheet of Ta heat shield.

These caps and wires will be sintered in Evap 1, so they may be prompted to contamination from the uranium processes. 

I have no choice but to use Evap1 to do this work since we are falling behind with the schedule.  

In the future, please have all the materials (targets, end caps, binder, etc) well prepared. 

I do not know what is the required current to sinter the caps since there is no temp measurement.  So, the best is to go with how the container was sintered, 580A. 


Monday, September 12, 2016, 17:36

Chamber has been pumped down to mid 10-6 Torr. 

Auto ramp to 580A at 2A/min.


 