Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1  Not logged in ELOG logo
Entry  Friday, October 17, 2014, 11:55, Laura Lambert, UC2, 40282-5, LP-SIS, In progress, Conditioning UCx #11 
    Reply  Monday, October 20, 2014, 16:22, John Wong, UC2, 40282-5, LP-SIS, Done, Conditioning UCx #11 power_bump.PNG
       Reply  Monday, November 10, 2014, 13:50, Laura Lambert, UC2, 40282-5, LP-SIS, Done, Conditioning UCx #11 
Message ID: 102     Entry time: Friday, October 17, 2014, 11:55     Reply to this: 103
Author: Laura Lambert 
Target Material: UC2 
Target Oven W.O#: 40282-5 
Source: LP-SIS 
Status: In progress 
Subject: Conditioning UCx #11 

 Friday, October 17, 2014, 11:47

Target container was previously coated with TaC spray and sintered.

It's is wrapped with 3 layers of Ta-heat shield, including the center block.

The target consists of 255 discs of UCx with 10.5cm in length.

A regular TaC coated endcap is inserted right, wrt the ionizer tube pointing down, so the left is open with a removable half-cap to allow out-gassing.

The chamber was pumped down overnight.

TGHT will be ramped up to 520A - keep heating the current for 4-5 hours.

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.

Auto ramp at 0.1A/min.


 Friday, October 17, 2014, 13:25

IG1 = 2.6e-6 Torr

Manually stepped up to 35A

Waited ~1hr15

IG1 = 4.2e-6 Torr

Initiating auto-ramp.


 