Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20, 2014. The slurry was cast on a piece of glass coated with WD40 on Aug 21, 2014.
The cast peeled off the glass nicely Aug 22, 2014 and let dry until Aug 25, 2014.
Some materials were stuck on the WC jar wall and balls as always noted.
Initial UO2 powder used = 50.75g (Inventory R-00835A UO2 + bottle = 595.37g before use)
Graphite powder used = 10.78g
Green cast dried UO2/C + organic mass = 62.86g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat is wrapped with 3-Ta layers of heat shield and installed in Evap1.
Chamber is currently being pumped down.
Target will be ramped up to 520A at the rate of 0.1A/min
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr
Wednesday, August 27, 2014, 11:18
Chamber has pumped down overnight. IG1 = 6.4e-6 Torr
Stepped TGHT up to 35A.
Wednesday, August 27, 2014, 14:41
Waited 1.5hrs for vacuum to fully stabilize, currently sitting at 2.2e-5 Torr.
Initiating auto-ramp.
Friday, September 12, 2014, 14:09
TGHT reached max 520A/5.6V last night.
Carbonization process complete (see attachment: carbonization)
IG1 = 7.6e-6 Torr
Initiating auto-cool at 2A/min
Will vent the chamber with Ar on Monday.
Monday, September 22, 2014, 14:52
complete, UO2/C in glove box
Thursday, October 09, 2014, 13:45
update rename: batch #11 - 08262014 to UC2Flk_03 |