Entry  Wednesday, June 13, 2018, 10:20, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, In progress, Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14 
    Reply  Wednesday, June 13, 2018, 11:09, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Problems, Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14 
       Reply  Wednesday, June 13, 2018, 12:25, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14 
Message ID: 210     Entry time: Wednesday, June 13, 2018, 12:25     In reply to: 209
Author: Marla Cervantes 
Target Material: UO2/C 
Target Oven W.O#: 40282-1 
Source: TARGET BOAT 
Status: Done 
Subject: Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14 

Marla Cervantes wrote:

Marla Cervantes wrote:

 Tuesday, June 12, 2018, 18:20

35 circles of 14 mm diameter of cast #4 were packed into a graphite sample container.

30 x UO2/C circles = 4.07 g

Graphite container mass = 5.3 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 used Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


Wednesday, June 13, 2018, 10:29 

Initial IGP1 = 6.43e-7 Torr

Tapped to 80A at 10A/10s with 20 s waiting period each 10 A

Waited 5 min for vacuum to stabilize.

Tapped to 90 A at 10A/10s with 20 s waiting period each 10 A

Waited 5 min to tap to 100 A 

Waited 14 min for vacuum to stabilize

Tapped to 400 A at 25A/30s with 30 s waiting period each 25 A

Tapped to 520 A at 20A/30s with 30 s waiting period each 20 A

Max pressure ~0.06 Torr 

 Wednesday, June 13, 2018, 11:08

Pressure was dropping indicating full carbothermal reduction but the current tripped off to 0 A.

 Wednesday, June 13, 2018, 12:23

The problem was reported to controls group

After 1 hour at 0 A, the autoramp was set to 4 A/min up to 520 A

The current and voltage are increasing accordingly.

The material will stay 4 hours at max point.


Thursday, June 14, 2018, 09:14 

After 4 hours the auto ramp was set to -1A/min to 0 A


Thursday, June 14, 2018, 14:47 

The IEVAP  was vented with Ar and the UCx was trasnferred to the glove box.