Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1  Not logged in ELOG logo
Message ID: 33     Entry time: Wednesday, September 07, 2011, 13:33
Author: John Wong 
Target Material: Empty 
Target Oven W.O#:  
Source:  
Status: Maintenance 
Subject: Changed Evaporator#1 Backing Pump oil  

Wednesday, September 07, 2011, 11:18:  

IEVAP:CG2 @ 52mT before oil change. 

Edi D.V changed the oil for the backing pump.  WP#2011-09-07-2. CG2 currently @ 21mT.

 

ELOG V2.9.2-2455