Fri Apr 8 14:51:37 2011: Target is wrapped with 3 Ta-heat shields. The evaporator has been pumped down for over 4 hrs, currently vac @ 2.8e-6 Torr. (See attachment #1, note: the drops in the IG1 reading were due to Controls group helping to fix the alarm handler notifications for the pagers.)
Fri Apr 8 14:56:21 2011: TGHT @ 20A/0.079V, panel reads 18V. Vac @ 2.73e-6 Torr.
Fri Apr 8 14:57:42 2011: TGHT @ 40A/0.165V, panel reads 18A. Vac @ 2.73e-6 Torr.
Fri Apr 8 14:59:51 2011: Auto heating begins. (See Attachment#2 for the parameter setup). The target heater will read to 820A at 21:30. ISAC Ops will help to cool down the target at around 05:00 on Saturday; instructions will be given.
Mon Apr 11 09:37:40 2011: Target was cooling on last Saturday April 9 by the help from ISAC Ops. (See Attachment#3 for the cooling down process).
Mon Apr 11 09:42:09 2011 : Evaporator is vented.
|