Wednesday, September 07, 2011, 15:31
125 discs of TaC/C
Total discs mass = 125
Total length = 4.5mm
Total Mass = 30.41g
No Ta-heat shield.
Left opening with D-TaC-sintered cap, and Right opening with regular TaC-sintered cap (orientation with the ionizer tube pointing out of the page).
Target is currently in the evaporator and being pumped down.
Thursday, September 08, 2011, 09:13
Evaporator has been pumped down over night, IG1 currently at 1.74 e-6 Torr.
Will begin TGHT, max @ 580A.
TGHT @ 50A, vac stable @ 1.7e-6 Torr.
Thursday, September 08, 2011, 10:18
THGT @ 90A, pressure is increasing, currently at 4.7e-5 Torr and going up.
Thursday, September 08, 2011, 10:25
Auto-heating has begun. Set rate at 2A/min to max current 580A.
Incrementing if vac < 5.0 e-5 Torr, backing off if vac > 6.0 e-5 Torr.
Friday, September 09, 2011, 07:58
TGHT auto cool down started @ 02:00, and at 0A. IG currently @ 1.3e-6 Torr. Venting chamber in progress. Target will be removed from the evaporator afterward.
Target looks good :) No signs of damage on the end cap or the target oven overall.
See attachment 1 for the striptool.
See attachment 2 and 3 for the target and endcaps after the sintering process.
|