March 23, 2011
12:30: Pumping down evaporator
18:24: IEVAPIG1 is reading at 4.55e-6 Torr. The p/s will be turned on tomorrow since there is no ISAC Ops on site.
March 24
11:57: Evaporator has pumped down over night. Vacuum @ 2.01e-6 Torr.
14:42: TGHT @ 20A, Vac @ 1.65e-6 Torr.
14:52: TGHT @ 40A, Vac @ 1.66e-6 Torr.
14:52: Auto Heating begins: TGHT to max 820A. Incrementing if vac < 4.5e-5 Torr, backing off if vac > 6.5e-5 Torr.
16:04: TGHT @ 181A, vac @ 7.59e-6 Torr.
18:03: TGHT @ 420A, vac @ 4.71e-6 Torr. (See attachment 2 for TGHT/IG1 for the past 4 hours)
March 25,
11:15: TGHT has been at 820A for 14hr. Vac @ 4.27e-6 Torr. (See attachement 3 for TGHT/IG1 for these past hours)
11:17: Auto cooling down is in progress...
17:21: Auto cooling down ended at TGHT ~100A. The TGHT was tabbed down manually from 100A to zero. (See attachment #4 for the cooling down progress)
|