Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1  Not logged in ELOG logo
Message ID: 148     Entry time: Wednesday, May 24, 2017, 09:34
Author: Laura Lambert 
Target Material:  
Target Oven W.O#:  
Source:  
Status: Maintenance 
Subject: VACUUM TRIP OFF SETPOINT CHANGED 

 Wednesday, May 24, 2017, 09:31

Last week the vacuum trip off point was changed to 8e-4 Torr when previously it was set to 8e-5 Torr.

Vacuum limits were set to stop at 5e-5 Torr and back-off at 6e-5 Torr

Now vacuum limits will be changed by an order of magnitude in an attempt to speed up the processes in the evaporator.


 

ELOG V2.9.2-2455