Oiled as per work permit: I2019-03-26-2.
Tuesday, March 26, 2019, 08:53: Start RP1
Tuesday, March 26, 2019, 09:03: Holding at 0.303T on CG2.
Tuesday, March 26, 2019, 09:10: Turned off RP1. Vent chamber slightly. Close VV1. Restarted RP1.
Open RV1.
Tuesday, March 26, 2019, 09:13: Vacuum stalls out at approx 0.300T.
Tuesday, March 26, 2019, 09:16: Shut off RP1. Contact Vacuum group.
Checked as per work permit: I2019-03-26-5
Tuesday, March 26, 2019, 13:50: Filter checked. OK
Tuesday, March 26, 2019, 14:00: Tees checked. OK.
Tuesday, March 26, 2019, 14:05: Line / bellows. Fail
Tuesday, March 26, 2019, 14:11: New line / bellows. OK
Tuesday, March 26, 2019, 14:19: TP1 on, IV1 opened. Vacuum @ 3.5e-05T and dropping.
Pumping down evap1. Dispose of the old line. Replacement successful. No contamination was found on the swipes.
Tuesday, March 26, 2019, 14:36: Vacuum @ 1.12e-05T and dropping. |