Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1  Not logged in ELOG logo
Message ID: 58     Entry time: Monday, September 03, 2012, 02:56
Author: Peter Kunz  
Target Material: UC2 
Target Oven W.O#: 39165-5 
Source: LP-SIS 
Status: In progress 
Subject: Conditioning UCx05 
Organic/volatile burnoff complete at TGHT = 190A. Rampdown initiated.
ELOG V2.9.2-2455