Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
Evaporator_1
Not logged in
List
Message ID:
60
Entry time:
Friday, September 07, 2012, 17:21
Author:
Peter Kunz
Target Material:
UC2
Target Oven W.O#:
39165-5
Source:
LP-SIS
Status:
In progress
Subject:
Conditioning UCx05
Target 6h at 520A. IEVAP:IG1 8.4e-6 Torr. Cool down sequence initiated.
ELOG V2.9.2-2455