Tuesday, October 10, 2017, 14:11
UO2/C green was prepared Oct 4th, 2017
The cast peeled off the glass nicely Oct 6th, 2017
Initial UO2 powder used = 50.26g (Inventory R-01032A, UO2 + bottle = 676.34g before use)
Graphite powder used = 10.12g
Green cast dried UO2/C + organic mass = 61.30g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield [reused] and installed in evap1 this morning.
Chamber currently pumping down.
Target boat will be ramped up to 520A.
Vacuum limit stop at 3.0e-4 Torr, backing off at 6.0e-4 Torr.
Wednesday, October 11, 2017, 09:06
IGP1 = 1.74e-6 Torr
Tapped up to 35A, 0.29V
Waited ~70min, vacuum stable.
IGP1 = 6.9e-6 Torr
Initiating auto-ramp at 0.2A/min
Wednesday, October 11, 2017, 13:06
IGP1 = 3.1e-4 Torr
TGHT = 61A, 0.49V
Vacuum stable.
Changing vacuum limits.
Vacuum limit stop at 5.0e-4 Torr, backing off at 8.0e-4 Torr.
Thursday, October 12, 2017, 08:31
IGP1 = 1.06e-5 Torr
TGHT = 275A, 2.55V
Vacuum stable.
Increasing ramping rate to 0.5A/min.
Thursday, October 12, 2017, 09:03
IGP1 = 1.47e-5 Torr
TGHT = 290A, 2.70V
Vacuum stable.
Increasing ramping rate to 1.0A/ 30sec.
Friday, October 13, 2017, 08:30
IGP1 = 5.8e-6 Torr
TGHT = 520A, 4.98V
Vacuum stable.
Carbonization process complete!
Evap1 has remained at max setpoints for ~17hrs
Initiating auto-cool at 1.0A/min
Tuesday, October 17, 2017, 15:01
TGHT had sat at 0A for at least 24hrs.
At ~3:30-4am this morning everything tripped off. The only thing remained on was the roughing pump.
Power bump? Did someone accidentally turn it off? Will follow up on this...
Vacuum was sitting at ~3.5e-2Torr when I noticed today.
Most vacuum had been lost, but there was still a small vacuum - materials should be okay.
Purged and vented in Ar.
Transferred materials to glove box.
|