Thursday, July 19, 2012, 17:09
UO2/C green was prepared on June 13, 2012.
UO2 powder used = 50.32g (Inventory R-00835A UO2 + bottle = 946.48g left)
Graphite powder used = 10.00g
The green was rolled and wrapped in a piece of graphite sheet.
The target boat was wrapped with 3 Ta-heat shield and installed in the Evap#1.
The chamber is currently being pumped down.
Friday, July 20, 2012, 09:50
IG1 currently at 6.2e-6 Torr, BP @ 31mTorr.
The target will be ramped up to 520A at 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TGHT tabbed up to 50A. Not much of change in the vacuum.
Initiated autoramping..
Friday, July 20, 2012, 10:18
TGHT tripped up at 51A due to high vacuum.
Lowered TGHT to 30A and begin auto ramping. Pressure is holding at 7e-5 Torr.
Wednesday, July 25, 2012, 11:57
TGHT has reached to 100A, and the vacuum is starting to come down from the high limit, 5e-5 Torr. (see attachment#1).
The organic burn-off is almost to complete and the carbonization process will begin soon.
Tuesday, August 07, 2012, 12:18
The carbonization process is completed. The target heater reached to 520A (local 515A,5.17V), vacuum at 4.0 e-6 Torr. (see attachment #2)
Cooling down is in process at 2A/min.
Tuesday, August 07, 2012, 17:44
TGHT has reached to 0A. IG currently @ 1.3e-6 Torr, BP @ 34mTorr.
The chamber will be vented with Ar gas tomorrow and the UC2 flakes will be transfer to the Ar-glove box.
|