Message ID: 219     Entry time: Saturday, September 29, 2018, 19:04
Author: John Wong 
Target Material: UO2/C 
Target Oven W.O#:  
Source: TARGET BOAT 
Status: In progress 
Subject: Processing UC2_flk_22 

Saturday, September 29, 2018, 18:52

Cast is from Jar#1.  (see process sheet for details)

Target boat contains about 50g UO2 powder. 

TGHT will be ramped up to 520A; fast tapping can be done, see elog#211, or set to autoramping with higher vacuum limit (1setup UCx process with pressure up to 60mTorr, see elog #210)

Chamber is currently being pumped down


 Saturday, September 29, 2018, 21:21

Pressure at 2.6e-5 Torr.

Tapping up TGHT in process


 Saturday, September 29, 2018, 21:32

Tapped to 80A/0.65V.  Wait for vacuum to stabilize.


 Saturday, September 29, 2018, 21:42

Pressure stabilized at 2.5mTorr.

Tapping up to 90A/0.701V


Saturday, September 29, 2018, 21:44

Pressure stabilized at 2.7m Torr; tapping up to 100A/0.77V


Saturday, September 29, 2018, 23:57

TGHT at 520A/4394V (see attachment for striptool capture).  Pressure at 163mTorr and coming down.


 Sunday, September 30, 2018, 12:56

At around midnight, pressure was coming down from 160 mTorr to 21 mTorr before TGHT tripped off (see attachment#2).

I suspect the TP was working too hard causing it to trip.

Pressure at 2.1e-6 Torr. 

Using auto-ramping.  Set good vac at 2.0e-4 Torr, bad vac at 5.0e-4 Torr.  Ramping TGHT at 2A/min to reah 520A.


 Sunday, September 30, 2018, 17:11

Pressure limiting at 0.2 mTorr as TGHT slowly ramping up, currently at 442A;  (see attachment#3).


 Monday, October 01, 2018, 21:15

TGHT was held at 520A for at least a day.  Vac at 3.7e-6 Torr.  Ramping down TGHT at 2A/min.


 

Attachment 1: striptool_capture.JPG  71 kB  Uploaded Sunday, September 30, 2018, 00:59  | Show | Hide all
Attachment 2: TGHT_tripped.JPG  72 kB  Uploaded Sunday, September 30, 2018, 14:01  | Show | Hide all
Attachment 3: pressure_limiting.JPG  68 kB  Uploaded Sunday, September 30, 2018, 18:13  | Show | Hide all