  Evaporator_1  Not logged in ELOG logo
Message ID: 133     Entry time: Monday, July 11, 2016, 16:00
Author: Laura Lambert 
Target Material: UC2 
Target Oven W.O#: 41790-3 
Source: LP-SIS 
Status: Done 
Subject: Conditioning UCx#17 

Monday, July 11, 2016, 15:54

Target container was previously coated with TaC spray and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block - new wrapping method-see elog112 evap2

The target consists of 216 discs of UCx with 7.6cm in length [4 packs of 5 + 196 single discs].

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 410A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog308 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


 Tuesday, July 12, 2016, 08:50

IG1 = 5.3e-6 Torr

Tapped up manually to 35A

Vacuum stable.

IG1 = 5.25e-6 Torr.

Initiating auto-ramp.


 Friday, July 15, 2016, 16:59

With evap2 not working, water was turned off to check valves...this tripped off evap1 since this also turned off the water to evap1.

TGHT was ~115A when evap1 tripped off.

Vacuum stable = 2.9e-6 Torr.

Tapped back up manually to 115A, 1.08V

Vacuum stable = 2.8e-6 Torr.

Restarting auto ramp at 0.1A/min.


 Friday, July 22, 2016, 16:25

Target has remained at max setpoints for 4.5days.

TGHT = 410A, 3.99V

IG1 = 2.5e-6 Torr

Voltage has wavered a small amount, between 3,91V-4.02V; this can be seen in the photo attached of the screenshot of the striptool.

Conditioning process is now complete.

Initiating auto-cool at 1.0A/min


 Tuesday, July 26, 2016, 16:48

Vented in Ar and currently transfering into glove box

will update elog tomorrow...


 Wednesday, July 27, 2016, 14:56

had a few problems with the transfer chamber in the glove box, but managed to get the target into the glove box okay last night.

was exposed to oxygen for minimal amount of time - transfer chamber wasnt flushing properly/ leak in james bond box


 

Attachment 1: trip-off.JPG  61 kB  Uploaded Friday, July 15, 2016, 18:23  | Show | Hide all
Attachment 2: snapshot_of_striptool.JPG  105 kB  Uploaded Friday, July 22, 2016, 17:28  | Show | Hide all