Subject: Graphite insert test #6 

 Wednesday, April 10, 2019, 13:30

Tantalum foil caps were added to a graphite insert (see picture caps)

 The insert was set in a tantalum tube previously coated and wrapped with 3 Ta sheets.

The system was installed in the EVAP1, and it will be heated for a week at 2000 C.

Currently pumping down.


 Thursday, April 11, 2019, 13:26

IGP1 = 9.9e-7 Torr

The current is tapped to 40 A

After 1hr the autoramp is set to 1 A/min to TGHT 500 A


The TGHT current remained at 500 A for week

until at April 18 at ~4:30 pm

a localized power outage tripped the EVAP1.


The EVAP1 was ventd with air and the tantalum tube was removed

The tantalum tube did not break.

Attachment 1: caps.jpg  1.249 MB  | Show | Hide all