  Evaporator_1  Not logged in ELOG logo
Entry  Thursday, July 30, 2015, 17:19, John Wong, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2_flk_07 IMG_20150714_145857963.jpg
    Reply  Tuesday, August 11, 2015, 10:23, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2_flk_07 
Message ID: 116     Entry time: Thursday, July 30, 2015, 17:19     Reply to this: 117
Author: John Wong 
Target Material: UO2/C 
Target Oven W.O#: 40282-1 
Source: TARGET BOAT 
Status: In progress 
Subject: Processing UC2_flk_07 

 Thursday, July 30, 2015, 17:10

The mixture of UO2/C was prepared on July 13, 2015.  See screen shot for more info. 

The material is loaded into a target boat and wrapped with 3 layers of Ta-heat shield. 

 Chamber is currently being pumped down

Target boat will be ramped up to 520A at the rate of 0.1A/min

Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.


 Friday, July 31, 2015, 14:33

Chamber has been pumped down overnight, currently at 3.3e-6 Torr.

Manually stepping up to 35A.

Set auto ramping TGHT to 200A at 0.1A/min for over the long weekend.  This current should be safe to just burn off the organic binder but not to start the carbonization process. 


Wednesday, August 05, 2015, 11:05 
 
TGHT reached 200A about 5 hours ago.  Organic burn out is complete.  
Begin carbonization:  Increase TGHT to 520A at 0.1A/min rate. 

 

Attachment 1: IMG_20150714_145857963.jpg  3.261 MB  | Show | Hide all