Tuesday, April 17, 2018, 10:30
UO2/C green was prepared April 12th, 2018
The cast peeled off the glass nicely April 13th, 2018
Initial UO2 powder used = 50.56g (Inventory R-01032A, UO2 + bottle = 626.28g before use)
Graphite powder used = 10.38g
Green cast dried UO2/C + organic mass = 61.40g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield [1 reused, 2 new] and installed in evap1 yesterday.
Chamber pumped down overnight.
IGP1 = 8.4e-7 Torr
Tapped up to 35A, 0.46V
Waited ~135min, vacuum stable.
IGP1 = 1.6e-5 Torr
Initiating auto-ramp at 0.2A/min
Target boat will be ramped up to 520A.
Vacuum limit stop at 3.0e-4 Torr, backing off at 6.0e-4 Torr.
Wednesday, April 18, 2018, 09:21
IGP1 = 9.6e-6 Torr
TGHT = 245A, 2.10V
Vacuum stable, increasing ramping rate to 0.5A/min.
Thursday, April 19, 2018, 08:35
IGP1 = 3.21e-6 Torr
Materials have finished carbonizing.
TGHT = 520A, 4.97V
Evap1 has remained at max setpoints for ~6.5hrs
Initiating auto-cool at 1.0A/min
Thursday, May 10, 2018, 10:33
Materials were vented in Ar and transferred to glove box on April 20th
|