Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1  Not logged in ELOG logo
Message ID: 83     Entry time: Monday, December 02, 2013, 16:09
Author: Anders Mjos 
Target Material:  
Target Oven W.O#:  
Source:  
Status: Problems resolved 
Subject: TGHT connector repositioned and tightened 

The right connector for the TGHT had rotated. It has now been repositioned and both connectors have been tightened to reduce the chance for further rotation.

Attachment 1: Evap1_rotated_TGHT_conductor_2013-12-02.pdf  226 kB  | Show | Hide all
ELOG V2.9.2-2455