44
|
Monday, November 14, 2011, 11:56 |
Peter Kunz | UC2 | 38634-10 | LP-SIS | Done | UCx03: Conditioning up to 175A | Evaporator was cleaned Nov 11 from after
target was conditioned up to 175A. There
was significant condensation of oily fluid |
|
58
|
Monday, September 03, 2012, 02:56 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Organic/volatile burnoff complete at TGHT
= 190A. Rampdown initiated. |
|
59
|
Tuesday, September 04, 2012, 17:26 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Organic gunk cleaned out. Beginning 2nd phase
of conditioning. |
|
60
|
Friday, September 07, 2012, 17:21 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Target 6h at 520A. IEVAP:IG1 8.4e-6 Torr.
Cool down sequence initiated. |
|
61
|
Monday, September 10, 2012, 11:00 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Plot of conditioning run: IEVAP:IG1, TGHT |
|
70
|
Tuesday, July 02, 2013, 11:13 |
Peter Kunz | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
1. stage - burning off organics complete
2. stage - carbonization began 1-8 |
|
175
|
Thursday, November 23, 2017, 13:39 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#3 | Thursday, November 23, 2017, 13:34
Circles from cast 1 were used, |
|
176
|
Wednesday, January 10, 2018, 14:44 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | In progress | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#4 | Wednesday, January 10, 2018, 14:44
Circles from cast 1 were used, |
|
178
|
Wednesday, January 17, 2018, 13:47 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#5 | Monday, January 15, 2018, 13:37
35 circles of 14 mm diameter |
|
179
|
Thursday, January 18, 2018, 11:56 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container TP1-off_#4 |
|
|
180
|
Friday, January 19, 2018, 12:32 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | In progress | Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6 | Friday, January 19, 2018, 12:29
Circles from cast 1 were used, |
|
181
|
Monday, January 22, 2018, 15:51 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Problems | Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6 |
|
|
182
|
Monday, January 22, 2018, 16:20 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Problems resolved | Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6 |
|
|
183
|
Tuesday, January 23, 2018, 12:49 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6 |
|
|
184
|
Monday, January 29, 2018, 09:28 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | In progress | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#7 | Monday, January 29, 2018, 09:26
35 circles of 14 mm diameter |
|
185
|
Monday, January 29, 2018, 11:07 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Problems | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#7 |
|
|
186
|
Monday, January 29, 2018, 14:25 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Problems resolved | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#7 |
|
|
187
|
Tuesday, January 30, 2018, 16:07 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#7 |
|
|
188
|
Thursday, February 01, 2018, 13:15 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#8 | Thursday, February 01, 2018, 12:59
35 circles of 14 mm diameter |
|
189
|
Monday, February 05, 2018, 17:26 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#9 | Monday,
February 05, 2018, 17:24
|
|
190
|
Thursday, February 08, 2018, 14:51 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Problems | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 | Thursday, February 08, 2018, 14:50
35 circles from cast#2 of 14 |
|
191
|
Friday, February 09, 2018, 16:57 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Problems resolved | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 |
|
|
192
|
Friday, February 09, 2018, 17:04 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 |
|
|
193
|
Tuesday, February 13, 2018, 11:44 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Problems | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#11 | Tuesday, February 13, 2018, 11:39
35 circles of 14 mm diameter |
|
195
|
Friday, March 02, 2018, 16:35 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Problems resolved | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#11 |
|
|
196
|
Friday, March 02, 2018, 16:35 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#11 |
|
|
197
|
Monday, March 12, 2018, 11:14 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#12 | Monday, March 12, 2018, 9:13
35 circles from cast#2 of 14 |
|
204
|
Friday, May 11, 2018, 12:36 |
Marla Cervantes | UC2 | 41369-2 | LP-SIS | Done | UCx Fully loaded graphite insert thermal test - FL#1 | Thursday, May 10, 2018, 16:00
Graphite insert fully loaded |
|
205
|
Friday, May 18, 2018, 18:38 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container #13 | Friday, May 18, 2018, 18:32
35 circles of 14 mm diameter |
|
206
|
Friday, May 25, 2018, 15:38 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing full length 1-step UCx target #2 | Friday,
May 25, 2018, 15:34
|
|
207
|
Monday, June 04, 2018, 11:29 |
Marla Cervantes | UC2 | 40282-1 | TARGET BOAT | Done | Conditioning B13 and 2sc | Friday, June 01, 2018, 11:20
Target boat was previously coated |
|
208
|
Wednesday, June 13, 2018, 10:20 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | In progress | Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14 | Tuesday, June 12, 2018, 18:20
35 circles of 14 mm |
|
209
|
Wednesday, June 13, 2018, 11:09 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Problems | Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14 |
|
|
210
|
Wednesday, June 13, 2018, 12:25 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14 |
|
|
211
|
Tuesday, June 19, 2018, 15:39 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container #15 | Friday, June 15, 2018, 16:39
35 circles of 14 mm |
|
216
|
Friday, August 17, 2018, 11:23 |
Marla Cervantes | UC2 | NA | | Done | UCx 1-step casting -Oxidation test | Friday, August 17, 2018, 11:17
Four discs of UCx produced with the
1-step casting method were placed in a glass |
|
217
|
Tuesday, September 04, 2018, 10:18 |
Marla Cervantes | UC2 | 41369-2 | | In progress | UCx Fully loaded graphite insert thermal test - FL#1.2 | Monday, September 03, 2018, 10:17
Graphite insert fully loaded |
|
222
|
Monday, October 22, 2018, 17:58 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Problems | Processing UC2Flk_22 | Monday, October 22, 2018, 17:55
UO2/C green was prepared , September |
|
223
|
Tuesday, October 23, 2018, 10:24 |
Marla Cervantes | UC2 | | LP-SIS | Problems | Conditioning UCx#25 |
|
|
224
|
Tuesday, October 23, 2018, 10:49 |
Marla Cervantes | UC2 | | LP-SIS | Problems resolved | Conditioning UCx#25 |
|
|
225
|
Tuesday, October 23, 2018, 10:55 |
Marla Cervantes | UC2 | | LP-SIS | Done | Conditioning UCx#25 |
|
|
226
|
Wednesday, October 24, 2018, 20:01 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Problems | Processing UC2Flk_22 |
|
|
227
|
Thursday, October 25, 2018, 09:10 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Done | Processing UC2Flk_22 |
|
|
228
|
Tuesday, October 30, 2018, 10:17 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | In progress | UCx Fully loaded graphite insert thermal test - FL#1 | Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered
(e-log 420 Evaporator_2) |
|
229
|
Wednesday, October 31, 2018, 10:30 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | Problems | UCx Fully loaded graphite insert thermal test - FL#1 |
|
|
230
|
Wednesday, October 31, 2018, 15:23 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | Done | UCx Fully loaded graphite insert thermal test - FL#1 |
|
|
231
|
Thursday, November 22, 2018, 17:32 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Problems | UCx Fully loaded graphite insert - UCx26 | Thursday, November 22, 2018, 17:25
D-shaped discs were cut from |
|
232
|
Monday, November 26, 2018, 17:06 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Done | UCx Fully loaded graphite insert - UCx26 |
|
|
235
|
Wednesday, March 27, 2019, 08:56 |
Marla Cervantes | | 43630-6 | | Done | Graphite insert test 4 | Wednesday, March 27, 2019, 08:50
A graphite insert was set into a
tantalum tube in the evaporator 2 for 3 days |
|
236
|
Friday, April 05, 2019, 10:08 |
Marla Cervantes | | 43630-3 | | Done | TaC coating/sintering for graphite insert test | Friday, April 05, 2019, 10:04
A tantalum tube was coated |
|
237
|
Wednesday, April 10, 2019, 13:38 |
Marla Cervantes | | 43630-3 | | Done | Graphite insert test #6 | Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to
a graphite insert (see picture caps) |
|
238
|
Friday, May 24, 2019, 15:25 |
Marla Cervantes | | 43943-1 | | Done | Graphite insert test - FOILS | Friday, May 24, 2019, 15:04
A TaC coated tantalum tube, loaded
with graphite foils was transferred to EVAP1 |
|
239
|
Monday, June 17, 2019, 08:58 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#27 Carbothermal reduction | Friday, June 14, 2019, 17:10
A 14 mm die was used to cut |
|
240
|
Tuesday, July 30, 2019, 10:27 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#28 Carbothermal reduction | Friday,
June 26, 2019, 17:10
|
|
241
|
Wednesday, September 18, 2019, 09:57 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #1 | Wednesday, September 18, 2019, 07:48
A TaC coated target container
was loaded with a graphite cartridge with |
|
242
|
Tuesday, September 24, 2019, 06:53 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #2 | Tuesday, September 24, 2019, 06:52
The target UCx28 that was previously |
|
243
|
Wednesday, September 25, 2019, 14:00 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #3 | Wednesday, September 25, 2019, 14:00
The target UCx28 that |
|
244
|
Friday, September 27, 2019, 18:04 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #4 | Friday, September 27, 2019, 18:03
The target UCx28 that |
|
245
|
Wednesday, October 02, 2019, 11:07 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #5 | Monday, September 30, 2019, 10:54
After being exposed to air for 1.5
hours, |
|
246
|
Wednesday, October 02, 2019, 11:10 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#29 Carbothermal reduction | Wednesday, October 02, 2019, 11:09
A graphite cartridge loaded with
UO2/C foils, wrapped with three Ta heat shields |
|
247
|
Tuesday, October 08, 2019, 09:53 |
Marla Cervantes | UC2 | 44062-6 | LP-SIS | Done | UCx29 Conditioning | Monday, October 07, 2019, 09:51
A TaC coated target |
|
248
|
Monday, October 28, 2019, 11:23 |
Marla Cervantes | UO2/C | | TARGET BOAT | In progress | UCx#30 Carbothermal Reduction | Monday, October 28, 2019, 10:29
A loaded graphite cartridge was set
in a tantalum boated and wrapped with 3 tantalum |
|
249
|
Thursday, October 31, 2019, 13:59 |
Marla Cervantes | UO2/C | | TARGET BOAT | Problems | UCx#30 Carbothermal Reduction |
|
|
251
|
Wednesday, November 06, 2019, 11:48 |
Marla Cervantes | UC2 | 44062-3 | LP-SIS | Done | UCx#30 Conditioning | Tuesday, November 05, 2019, 16:43
A TaC coated target container |
|
252
|
Wednesday, January 22, 2020, 18:10 |
Marla Cervantes | Empty | P2N-02 | | Done | P2N test#1 | The assembly consists of two tantalum
foils, 0.001" thick, which are radially
crimped to form a cylindrical surface. The |
6x |
253
|
Wednesday, January 29, 2020, 10:11 |
Marla Cervantes | Empty | P2N-02 | | Done | P2N test#2 | The assembly consists of two tantalum
foils, 0.001" thick, which are radially
crimped to form a cylindrical surface. The |
|
254
|
Thursday, January 30, 2020, 09:37 |
Marla Cervantes | UO2/C | P2N-02 | | In progress | P2N target material carbothermal reduction | Wednesday, January 29 2020, 05:55
A P2N container with |
|
255
|
Thursday, January 30, 2020, 10:15 |
Marla Cervantes | UO2/C | P2N-02 | | Problems | P2N target material carbothermal reduction |
|
|
256
|
Thursday, January 30, 2020, 11:53 |
Marla Cervantes | UO2/C | P2N-02 | | Problems resolved | P2N target material carbothermal reduction |
|
|
257
|
Thursday, January 30, 2020, 13:11 |
Marla Cervantes | UO2/C | P2N-02 | | Problems | P2N target material carbothermal reduction |
|
|
258
|
Friday, January 31, 2020, 15:36 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N target material carbothermal reduction |
|
|
263
|
Thursday, August 13, 2020, 14:37 |
Marla Cervantes | UO2/C | P2N-02 | | Problems | P2N target material carbothermal reduction |
|
|
265
|
Tuesday, August 18, 2020, 20:45 |
Marla Cervantes | UO2/C | P2N-02 | | Problems resolved | P2N target material carbothermal reduction |
|
|
266
|
Wednesday, August 19, 2020, 07:49 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N carbothermal reduction (#2) | Wednesday,
August 19, 2020, 07:47
|
|
267
|
Tuesday, September 08, 2020, 20:45 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-2 carbothermal reduction | Tuesday, September 08, 2020, 20:44
A P2N oven with three heat shields, |
|
268
|
Thursday, September 10, 2020, 14:07 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-2 Conditioning | Thursday, September 10, 2020, 14:01
A P2N target was carbothermal reduced
but at the maximum current, the power supply |
|
269
|
Tuesday, March 30, 2021, 16:04 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-3 carbothermal reduction | Green
target material characteristics (elog |
|
270
|
Thursday, April 15, 2021, 15:01 |
Marla Cervantes | | | | | IGP1 patch | Thursday, March 31, 2021, 14:42
EVAP1's TGHT has |
|
271
|
Saturday, June 05, 2021, 09:14 |
Marla Cervantes | UC2 | | TARGET BOAT | In progress | UCx#33 Conditioning | Saturday, June 05, 2021, 08:57
Target #33 was installed in |
|
274
|
Wednesday, September 15, 2021, 07:19 |
Marla Cervantes | UC2 | | TARGET BOAT | Done | Conditioning 2sc samples | Wednesday, September 14, 2021, 21:14
Boat is wrapped with 2 layers |
|
276
|
Friday, September 24, 2021, 15:40 |
Luca Egoriti | Ta | | LP-SIS | In progress | Full target release test 1 | Friday, September 24, 2021, 15:38
Full target loaded with ~500 non-active
foils plus 4 active foils. |
|
277
|
Friday, November 05, 2021, 13:38 |
Luca Egoriti | Ta | | LP-SIS | In progress | Full target release test 2 | Friday, November 05, 2021, 13:23
Full target loaded with ~500 |
|
278
|
Wednesday, November 24, 2021, 10:38 |
Luca Egoriti | Ta | | | In progress | IPF release tests | Wednesday, November 24, 2021, 10:38
A first, short "FullTa1"
target was loaded into the evap1. It consists |
|
279
|
Wednesday, April 13, 2022, 10:55 |
Luca Egoriti | UC2 | | P2N-SIS | Done | P2N carbothermal reduction P2Ncartridge-220323 | Wednesday, April 13, 2022, 10:50
P2NC-220323
Preparing the P2N-UCx for online |
|
280
|
Wednesday, May 04, 2022, 09:47 |
Luca Egoriti | UC2 | | P2N-SIS | Done | P2N carbothermal reduction P2NC220408 | Wednesday, May 04, 2022, 09:42
Yesterday, a second graphite cartridge
was installed in EVAP1, it consists of the |
|
66
|
Wednesday, June 05, 2013, 16:52 |
Laura Lambert | UC2 | 39165-6 | LP-SIS | Done | Conditioning UCx#06 |
|
|
68
|
Tuesday, June 25, 2013, 14:49 |
Laura Lambert | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) | Tuesday, June 25, 2013, 14:35
UO2/C green was prepared on June
18, 2013 and let dry over the weekend. |
|
73
|
Friday, August 02, 2013, 11:06 |
Laura Lambert | UC2 | 38634-7 | LP-SIS | In progress | Conditioning UCx # 07 | Thursday, August 01, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2. |
|
77
|
Tuesday, September 10, 2013, 12:20 |
Laura Lambert | UO2/C | Target Boat #2 | | Done | Processing UC2 flaskes (batch#06 - 08222013 |
|
|
78
|
Thursday, September 19, 2013, 15:41 |
Laura Lambert | UO2/C | Target Boat #2 | | In progress | Processing UC2 flakes (batch #07 - 09192013) | Thursday, September 19, 2013, 15:35
UO2/C green was prepared on Aug 17,
2013. The slurry was cast on a piece of glass |
|
85
|
Thursday, January 23, 2014, 16:29 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating | Thursday, January 23, 2014, 16:26
A new target boat was sprayed
with TaC coating and let dry, the coating |
|
86
|
Friday, January 24, 2014, 14:45 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating |
|
|
87
|
Monday, January 27, 2014, 11:03 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | Done | Sintering Ta target boat with TaC coating |
|
|
88
|
Wednesday, February 05, 2014, 14:29 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_01 | Wednesday, February 05, 2014, 14:13
1st attempt:
UO2/C green was prepared on Feb 4, |
|
90
|
Wednesday, March 05, 2014, 10:30 |
Laura Lambert | | | TARGET BOAT | In progress | Re-sinterring end caps |
|
|
97
|
Wednesday, July 09, 2014, 13:57 |
Laura Lambert | ThO2 | 40282-2 | TARGET BOAT | Done | Test: Sintering ThO2 with Nb backing foils |
|
|
99
|
Tuesday, August 26, 2014, 15:27 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_03 | Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20,
2014. The slurry was cast on a piece of glass |
|
100
|
Tuesday, September 23, 2014, 15:00 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | In progress | Processing UC2Flk_04 | Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18,
2014. The slurry was cast on a piece of glass |
|
102
|
Friday, October 17, 2014, 11:55 |
Laura Lambert | UC2 | 40282-5 | LP-SIS | In progress | Conditioning UCx #11 | Friday, October 17, 2014, 11:47
Target container was previously coated
with TaC spray and sintered. |
|
104
|
Monday, November 10, 2014, 13:50 |
Laura Lambert | UC2 | 40282-5 | LP-SIS | Done | Conditioning UCx #11 |
|
|
105
|
Thursday, December 11, 2014, 10:17 |
Laura Lambert | | | | Maintenance | water supply shut off for lab closure over holidays | Thursday, December 11, 2014, 10:16
water valve shut off for lab closure
over the holidays. |
|
106
|
Friday, January 23, 2015, 15:02 |
Laura Lambert | | | | Maintenance | water supply turned back on to EVAP1 and fume hoods | Friday, January 23, 2015, 15:02
water supply turned back on to EVAP1
and fume hoods |
|
107
|
Monday, January 26, 2015, 11:28 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_05 | Monday, January 26, 2015, 11:19
UO2/C green was prepared Jan 20,
2015. The slurry was cast on a piece of glass |
|
108
|
Monday, March 09, 2015, 16:58 |
Laura Lambert | Empty | | TARGET BOAT | Maintenance | Testing new software | Monday, March 09, 2015, 16:55
After upgrading IOC for CXML program,
experienced some issues; therefore, switched |
|
109
|
Friday, March 20, 2015, 15:21 |
Laura Lambert | UC2 | 41177-2 | LP-SIS | Done | Conditioning UCx #12 | Friday, March 20, 2015, 15:17
Target container was previously |
|
110
|
Tuesday, April 21, 2015, 11:28 |
Laura Lambert | | | | Maintenance | Ion Gauge replaced March 23rd 2015 | |
|
111
|
Monday, May 11, 2015, 11:49 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_06 | Monday, May 11, 2015, 11:45
UO2/C green was prepared May |
|
112
|
Tuesday, June 30, 2015, 13:31 |
Laura Lambert | UC2 | 40860-1 | LP-IG-LIS | In progress | Conditioning UCx #13 | Tuesday, June 30, 2015, 13:28
Target container was previously |
|
114
|
Friday, July 03, 2015, 13:45 |
Laura Lambert | UC2 | 40860-1 | LP-IG-LIS | In progress | Conditioning UCx #13 |
|
|
117
|
Tuesday, August 11, 2015, 10:23 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2_flk_07 |
|
|
118
|
Wednesday, August 19, 2015, 11:44 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_08 | Wednesday, August 19, 2015, 11:02
UO2/C green was prepared Aug |
8x |
122
|
Monday, October 26, 2015, 16:20 |
Laura Lambert | UC2 | 41077-5 | LP-SIS | Done | Conditioning UCx#14 |
|
|
123
|
Friday, December 04, 2015, 15:06 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | 1stepUCx project - round1 | Wednesday, December 02, 2015, 14:08
UO2/C was cast onto a graphite sheet
in the fume hood and let dry. |
|
124
|
Thursday, December 10, 2015, 10:59 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | 1stepUCx project - round2 | Thursday, December 10, 2015, 08:54
Filled graphite tube with 34 UO2/C
discs cast onto graphite. |
|
125
|
Thursday, February 18, 2016, 15:42 |
Laura Lambert | UC2 | 41077-1 | LP-SIS | In progress | Conditioning UCx#15 | Thursday, February 18, 2016, 15:34
Target container was previously |
|
127
|
Monday, February 29, 2016, 16:16 |
Laura Lambert | UC2 | 41077-1 | LP-SIS | Done | Conditioning UCx#15 |
|
|
128
|
Tuesday, March 08, 2016, 11:19 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_10 | Tuesday, March 08, 2016, 10:01
UO2/C green was prepared March |
|
129
|
Tuesday, April 05, 2016, 11:12 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_11 | Tuesday, April 05, 2016, 10:58
UO2/C green was prepared March |
|
130
|
Tuesday, April 19, 2016, 10:48 |
Laura Lambert | UC2 | *** | | Done | ***ALL FUTURE UCx TARGETS*** | Tuesday, April 19, 2016, 09:47
Temperature measurements have been
taken in evap2 on target containers. |
|
131
|
Monday, May 16, 2016, 15:52 |
Laura Lambert | | | | | Full clean of EVAP1 | Monday, May 16, 2016, 15:51
full clean of inside evap1 this afternoon.
|
|
132
|
Wednesday, May 18, 2016, 15:15 |
Laura Lambert | UC2 | 40860-2 | LP-IG-LIS | Done | Conditioning UCx#16 | Wednesday, May 18, 2016, 15:05
Target container was previously |
|
133
|
Monday, July 11, 2016, 16:00 |
Laura Lambert | UC2 | 41790-3 | LP-SIS | Done | Conditioning UCx#17 | Monday, July 11, 2016, 15:54
Target container was previously |
|
136
|
Tuesday, September 20, 2016, 10:49 |
Laura Lambert | | | TARGET BOAT | Done | RUSH. Sintering end-caps |
|
|
137
|
Friday, September 23, 2016, 16:09 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_12 | Friday, September 23, 2016, 16:01
*Note: materials were scaled back
small amount since only 48.5g of UO2 was |
|
138
|
Wednesday, October 19, 2016, 16:52 |
Laura Lambert | UC2 | 41790-6 | LP-SIS | Done | Conditioning UCx#18 | Wednesday, October 19, 2016, 16:47
Target container was previously |
|
139
|
Monday, November 07, 2016, 13:34 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | In progress | Processing UC2Flk_13 | Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov |
|
141
|
Wednesday, November 16, 2016, 16:41 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_13 |
|
|
142
|
Tuesday, November 29, 2016, 16:20 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_14 | Tuesday, November 29, 2016, 16:13
UO2/C green was prepared Nov |
|
143
|
Tuesday, December 20, 2016, 15:03 |
Laura Lambert | | | | Maintenance | RETURN and SUPPLY valves CLOSED for xmas break | |
|
144
|
Thursday, February 16, 2017, 15:09 |
Laura Lambert | UC2 | 42218-12 | LP-SIS | Done | Conditioning UCx#19 | Thursday, February 16, 2017, 15:04
Target container was previously |
|
145
|
Friday, March 03, 2017, 15:51 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_15 | Friday, March 03, 2017, 08:53
UO2/C green was prepared |
|
146
|
Thursday, April 20, 2017, 11:41 |
Laura Lambert | UC2 | 42218-1 | LP-IG-LIS | Done | Conditioning UCx#20 | Thursday, April 20, 2017, 11:31
Target container was previously |
6x |
147
|
Tuesday, May 23, 2017, 15:51 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | In progress | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS | Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May |
|
148
|
Wednesday, May 24, 2017, 09:34 |
Laura Lambert | | | | Maintenance | VACUUM TRIP OFF SETPOINT CHANGED | Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point
was changed to 8e-4 Torr when previously |
|
149
|
Friday, May 26, 2017, 15:23 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Problems | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
|
6x |
150
|
Friday, May 26, 2017, 16:09 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | In progress | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
|
|
151
|
Monday, May 29, 2017, 08:54 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Problems | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
|
|
152
|
Tuesday, May 30, 2017, 07:43 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
|
|
154
|
Monday, June 12, 2017, 15:07 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_17 | Monday, June 12, 2017, 11:41
UO2/C green was prepared June |
|
155
|
Wednesday, July 12, 2017, 17:07 |
Laura Lambert | UC2 | 42218-15 | LP-SIS | In progress | Conditioning UCx#21 | Wednesday, July 12, 2017, 17:06
Target container was previously |
|
156
|
Thursday, July 13, 2017, 12:49 |
Laura Lambert | | | | Problems | *hot lab is HOT* | Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every
day this week and went up to 28C today! |
|
157
|
Thursday, July 13, 2017, 14:50 |
Laura Lambert | UC2 | 42218-15 | LP-SIS | Problems | Conditioning UCx#21 |
|
|
158
|
Wednesday, July 19, 2017, 14:15 |
Laura Lambert | UC2 | 42218-15 | LP-SIS | Problems resolved | Conditioning UCx#21 |
|
|
159
|
Wednesday, July 19, 2017, 14:17 |
Laura Lambert | UC2 | 42218-15 | LP-SIS | In progress | Conditioning UCx#21 |
|
|
160
|
Thursday, July 20, 2017, 15:00 |
Laura Lambert | UC2 | 42218-15 | LP-SIS | Problems | Conditioning UCx#21 |
|
|
161
|
Thursday, July 20, 2017, 15:35 |
Laura Lambert | UC2 | 42218-15 | LP-SIS | Problems resolved | Conditioning UCx#21 |
|
|
162
|
Thursday, July 20, 2017, 15:57 |
Laura Lambert | UC2 | 42218-15 | LP-SIS | Done | Conditioning UCx#21 |
|
|
163
|
Thursday, July 27, 2017, 09:08 |
Laura Lambert | | | | Problems resolved | *hot lab is HOT* |
|
|
164
|
Wednesday, August 23, 2017, 15:54 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UC2 discs for 1stepUCx in graphite sample container _#1 | Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast |
|
167
|
Thursday, September 21, 2017, 11:35 |
Laura Lambert | Empty | | | Done | Testing TBHT [1st run!], RP [new oil] and IG [new gauge] | Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to
allow current to be applied. |
|
168
|
Wednesday, September 27, 2017, 12:05 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_18 | Wednesday, September 27, 2017, 09:25
UO2/C green was prepared Sept |
|
169
|
Tuesday, October 10, 2017, 14:16 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_19 | Tuesday, October 10, 2017, 14:11
UO2/C green was prepared Oct |
|
170
|
Tuesday, November 07, 2017, 11:57 |
Laura Lambert | | | | Maintenance | Interlocks limits changed to 100mTorr | Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed
to 100mTorr for both TGHT and TBHT by Ray |
|
171
|
Tuesday, November 07, 2017, 12:04 |
Laura Lambert | | | | Maintenance | Noise levels checked - ear protection not required. | Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor
by Terry. |
|
172
|
Tuesday, November 07, 2017, 14:38 |
Laura Lambert | Empty | | LP-FEBIAD | Done | TBHT test with LP-FEBIAD | Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago
for temperature measurements is used for |
|
173
|
Tuesday, November 14, 2017, 16:16 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UC2 discs for 1stepUCx in graphite sample container _#2 | Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used, |
|
174
|
Wednesday, November 22, 2017, 14:20 |
Laura Lambert | | | | Maintenance | New eye wash for hot lab! | Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple
attachment on sink spout. |
|
177
|
Friday, January 12, 2018, 07:46 |
Laura Lambert | UO2/C | | TARGET BOAT | In progress | Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#4 |
|
|
194
|
Wednesday, February 28, 2018, 15:21 |
Laura Lambert | Empty | | TARGET BOAT | Done | Testing TGHT to induce trip | Wednesday, February 28, 2018, 15:19
Last two rounds of materials in evap1
have tripped off the TGHT in epics within |
|
198
|
Tuesday, March 20, 2018, 14:52 |
Laura Lambert | UC2 | 42218-13 | LP-SIS | Done | Conditioning UCx#22 | Tuesday, March 20, 2018, 14:43
Target container was previously |
|
199
|
Wednesday, March 28, 2018, 11:46 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | In progress | Carbonizing first full length 1step UCx target | Wednesday, March 28, 2018, 11:35
D-shaped discs were cut from |
|
200
|
Monday, April 09, 2018, 16:51 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Problems | Carbonizing first full length 1step UCx target |
|
|
201
|
Monday, April 09, 2018, 16:53 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Problems resolved | Carbonizing first full length 1step UCx target |
|
|
202
|
Tuesday, April 10, 2018, 14:49 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing first full length 1step UCx target |
|
|
203
|
Tuesday, April 17, 2018, 12:45 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Done | Processing UC2Flk_20 | Tuesday, April 17, 2018, 10:30
UO2/C green was prepared April |
|
1
|
Wednesday, March 23, 2011, 18:23 |
John Wong | | | | | Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) | March 23, 2011
12:30: Target oven is wrapped with
3 Ta-heat shields. Pumping down evaporator |
|
2
|
Friday, March 25, 2011, 17:22 |
John Wong | | | | | Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) |
|
|
4
|
Monday, March 28, 2011, 12:29 |
John Wong | Empty | 38481-8 | HP-FEBIAD | Done | Fins diffusion bonding | March 28, 2011
12:28: Target oven is wrapped
with 3 Ta-heat shields. Pumping down |
|
7
|
Tuesday, April 05, 2011, 10:37 |
John Wong | Empty | 38481-6 | HP-FEBIAD | Done | Fins diffusion bonding | Tue Apr 5 10:36:53 2011: Target
oven is wrapped with 3 Ta-heat shields.
The evaporator is in the process of pumping |
|
8
|
Wednesday, April 06, 2011, 17:07 |
John Wong | Empty | 37978-1 | HP-FEBIAD | Done | Fins diffusion bonding | Wed Apr 6 17:06:56 2011: Target oven is
wrapped with 3 Ta-heat shields. Pumping
down evaporator in progress. |
|
9
|
Friday, April 08, 2011, 14:55 |
John Wong | Empty | 38295-8 | HP-FEBIAD | Done | Fins diffusion bonding | Fri Apr 8 14:51:37 2011: Target
is wrapped with 3 Ta-heat shields.
The evaporator has been pumped down for over |
|
10
|
Monday, April 11, 2011, 10:22 |
John Wong | Empty | 38295-9 | HP-FEBIAD | Done | Fins diffusion bonding | Mon Apr 11 10:21:56 2011: Target is wrapped
with 3 Ta-heat shields. Evaporator
is pumping down. |
|
11
|
Tuesday, April 12, 2011, 10:30 |
John Wong | Empty | 38481-5 | HP-FEBIAD | Done | Fins diffusion bonding | Tue Apr 12 10:29:38 2011: Target
wrapped with 3 Ta-heat shields. Evaporator
is currently being pumped down. |
|
12
|
Wednesday, April 13, 2011, 10:37 |
John Wong | Empty | 38481-7 | HP-FEBIAD | Done | Diffusion bonding of Ta Fins for FEBIAD-HP | Wed Apr 13 10:37:25 2011: Target
is wrapped with 3 Ta-heat shields.
Evaporator is currently being pumped down. |
|
13
|
Thursday, April 14, 2011, 09:53 |
John Wong | Empty | 37810-1 | HP-FEBIAD | Done | Fins Diffusion bonding | Thu Apr 14 09:52:59 2011: Target is wrapped
with 3-Ta heat shield and ready to go into
the evaporator. |
|
15
|
Thursday, April 14, 2011, 17:03 |
John Wong | Empty | 38481-7 | HP-FEBIAD | Problems resolved | Evap. bolt/washer problems & solutions | Thu Apr 14 14:03:17 2011:
What did we see after the fin diffusion bonding
of Ta fins for FEBIAD-HP (w.o#38481-7) |
6x |
16
|
Monday, April 18, 2011, 18:14 |
John Wong | Empty | 38295-8 | HP-FEBIAD | Problems | Sintering target oven coated with TaC | Mon Apr 18 18:10:53 2011:
FEBIAD-HP target (w.o 38295-8) is
coated with TaC (previously prepared on Feb |
|
17
|
Wednesday, April 20, 2011, 16:42 |
John Wong | Empty | 38481-8 | HP-FEBIAD | Done | Sintering target oven coated with TaC | Wed Apr 20 16:39:46 2011: Target
oven was coated with TaC early today.
The target was allowed to dry and then wrapped |
|
18
|
Monday, May 09, 2011, 16:10 |
John Wong | Empty | 38817-1 | HP-SIS | Done | Diffusion bonding of Ta Fins | Mon May 9 16:09:35 2011: Target
is wrapped with 3 Ta heatshields and the
evaporator is begin pumped down. |
|
19
|
Tuesday, May 10, 2011, 14:58 |
John Wong | Empty | 38817-2 | HP-SIS | Done | Diffusion bonding of Ta Fins for HP-SIS (w.o#38817-2) | Tue May 10 14:56:05 2011: Target
is wrapped with 3 heat-shields. The
evaporator is pumping down, vac @ 4.72e-6 |
|
20
|
Wednesday, May 11, 2011, 16:23 |
John Wong | SiC | 38481-8 | HP-FEBIAD | Problems | Organics burnoff & Sintering | Wed May 11 16:20:21 2011: The HP-FEBIAD
(w.o#38481-8) was filled with SiC (8.5mm,
555 discs). The target is wrapped with |
9x |
21
|
Tuesday, May 17, 2011, 16:43 |
John Wong | | | | Maintenance | Evaporator Ion gauge replaced | The evaporator ion gauge filament burnt
out on May 11, 2011. A target was in
the evaporator at that time and was about |
|
22
|
Wednesday, May 18, 2011, 13:13 |
John Wong | SiC | 38295-8 | HP-FEBIAD | Problems | Organics burnoff & Sintering | Wed May 18 13:12:24 2011: Target
is wrapped with 3 Ta-heat shields and is
installed in the evaporator which is being |
6x |
23
|
Wednesday, May 25, 2011, 14:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#1: UO2/C mixing & carbonization | Before began the carbonization process,
two cameras were setup in the hotlab for
monitoring the evaporator and the power supply. |
|
24
|
Thursday, June 30, 2011, 12:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#2: UO2/C for carbonization | Before began the
carbonization process, two cameras were setup |
|
25
|
Monday, July 18, 2011, 15:55 |
John Wong | Empty | 38634-3 | LP-SIS | Done | Sintering TaC coating for UCx#2 | Monday, July 18, 2011, 15:53: Target
oven was coated with TaC and let dry over
the weekend. The target is now installed |
|
26
|
Wednesday, July 27, 2011, 13:02 |
John Wong | UC2 | 38634-3 | LP-SIS | Problems | UCx#2 conditioning | Wednesday, July 27, 2011, 12:58:
Target length = 11.2cm
Total UC2/C foils = 245 discs |
|
27
|
Wednesday, August 03, 2011, 17:16 |
John Wong | Empty | 38634-8 | LP-SIS | Done | Sintering TaC coating | Wednesday, August 03, 2011, 20:27 : Target
was wrapped with 3 new Ta-heat shields and
2 around the back block. The tar from |
|
28
|
Thursday, August 04, 2011, 17:46 |
John Wong | UC2 | 38634-8 | LP-SIS | Problems resolved | Repacking UCx in new target oven | Thursday, August 04, 2011, 17:44:
All the UCx material from target oven 38634-3
was recovered and repacked in this new oven. |
|
29
|
Monday, August 29, 2011, 11:21 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 | Monday, August 29, 2011, 13:16: Target
oven was coated with TaC and let dry over
night. The target oven is in the evaporator |
|
31
|
Tuesday, August 30, 2011, 16:30 |
John Wong | Empty | Target Boat | LP-SIS | Done | Sintering of End Caps |
|
|
32
|
Tuesday, September 06, 2011, 17:05 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 |
|
|
33
|
Wednesday, September 07, 2011, 13:33 |
John Wong | Empty | | | Maintenance | Changed Evaporator#1 Backing Pump oil | Wednesday, September 07, 2011, 11:18:
IEVAP:CG2 @ 52mT before oil change.
Edi D.V changed the oil for the backing |
|
34
|
Wednesday, September 07, 2011, 13:41 |
John Wong | TaC | 38634-6 | LP-SIS | Done | TaC#1: Sintering and Organics burn-off | Wednesday, September 07, 2011, 15:31
125 discs of TaC/C
Total discs mass = 125 |
|
36
|
Friday, September 09, 2011, 10:05 |
John Wong | Empty | | HP-FEBIAD | Done | Sintering TaC coating | Friday, September 09, 2011, 10:05
Target oven coated with TaC, and
wrapped with 3-Ta heat shields. Chamber |
|
37
|
Monday, September 12, 2011, 13:08 |
John Wong | Empty | Target Boat | | Done | Sintering TaC coating on End Caps | Monday, September 12, 2011, 13:07
Target boat is loaded with coated
TaC end caps for sintering. Target |
|
38
|
Tuesday, September 13, 2011, 16:53 |
John Wong | SiC | 38295-9 | HP-FEBIAD | Done | Ready | Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat
shields. |
9x |
39
|
Wednesday, September 21, 2011, 13:23 |
John Wong | Empty | 38634-10 | LP-SIS | Done | Sintering TaC coating on target oven for UCx#3 | Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. |
|
40
|
Thursday, September 22, 2011, 20:34 |
John Wong | Empty | 38634-9 | LP-SIS | Done | Sintering TaC coating for UCx#2 (spare) | Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down. |
|
41
|
Thursday, September 29, 2011, 10:58 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UCx#3: Batch#1 - UO2/C mixture of carbonization | Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday
Sept 27, casted on a piece of glass and let |
6x |
42
|
Thursday, October 06, 2011, 12:22 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UCx#3: Batch#2 - UO2/C mixture of carbonization | Thursday, October 06, 2011, 12:19
|
|
43
|
Thursday, November 03, 2011, 09:24 |
John Wong | UC2 | 38634-10 | LP-SIS | Done | UCx#3: Final conditioning | Thursday, November 03, 2011, 08:59
Target was previously coated/sintered
with TaC & wrapped with 3 Ta-heat shields, |
|
45
|
Tuesday, February 14, 2012, 21:56 |
John Wong | UO2 | 38481-9 | LP-FEBIAD | Done | UO2/Nb sintering process | Tuesday, February 14, 2012, 20:58
Evaporator is setup for UO2/Nb sintering
process. |
|
46
|
Thursday, April 05, 2012, 16:47 |
John Wong | Empty | 38817-3 | HP-SIS | Done | Coating target oven /w TaC & sintering | Thursday, April 05, 2012, 16:43
Target oven is coated with TaC.
The oven is wrapped with 3 Ta-heat shields. |
|
47
|
Tuesday, May 08, 2012, 07:42 |
John Wong | SiC | 38817-3 | HP-SIS | Done | Sintering SiC | Tuesday, May 08, 2012, 07:32
Target oven is filled with 240 discs
of SiC/C, and wrapped with 3 Ta-foils. |
|
48
|
Monday, May 14, 2012, 15:22 |
John Wong | | Target boat | | | Testing the new graphite foil from Ceramaterial | Monday, May 14, 2012, 15:04
Due to the differences in the use
of the graphite foils in past SiC targets |
|
49
|
Wednesday, June 06, 2012, 16:58 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UC2 flakes for UCx#4: batch#01-04062012 | Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June
04, 2012. |
7x |
50
|
Monday, June 11, 2012, 10:48 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems | UC2 flakes - batch#01-04062012: broken seal & TGHT power supply |
|
|
51
|
Tuesday, June 12, 2012, 11:38 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems resolved | UC2 flakes - batch#01-04062012: broken seal & TGHT power supply |
|
|
52
|
Tuesday, June 12, 2012, 14:43 |
John Wong | | | | Maintenance | Changing backing pump oil | Tuesday, June 12, 2012, 14:38
The backing pump oil was changed
(ISAC WP#2012-06-12-1). |
|
53
|
Sunday, June 24, 2012, 22:52 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems | UC2 flakes - batch#01-04062012: IOC problems |
|
|
54
|
Monday, June 25, 2012, 16:00 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems resolved | UC2 flakes - batch#01-04062012: Fiber converters failed |
|
|
55
|
Tuesday, July 10, 2012, 12:54 |
John Wong | UC2 | 38634-9 | LP-SIS | Done | UCx#4 final conditioning completed | Tuesday, July 10, 2012, 12:44
Target contains 230 discs of UCx
(material from UC2 flakes, batch#01-04062012). |
|
56
|
Thursday, July 19, 2012, 17:14 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes for UCx#5 - (batch#02-13062012) | Thursday, July 19, 2012, 17:09
UO2/C green was prepared on June
13, 2012. |
|
57
|
Friday, August 24, 2012, 16:44 |
John Wong | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx#5 | Friday, August 24, 2012, 16:40
Target is loaded with 245 discs of
UCx (material from batch#02-13062012), |
|
62
|
Thursday, October 25, 2012, 15:03 |
John Wong | BeO | Ta-target boat (old) | | In progress | Sintering BeO pellets #5 - testing Re foil as the protective under layer | Thursday, October 25, 2012, 14:50
Previous sintering BeO tests, pellets
1 to 4 were done in Evaporator#2. |
|
63
|
Tuesday, April 02, 2013, 17:46 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes for UCx#6 (batch#03 - 02042013) | Tuesday, April 02, 2013, 17:25
UO2/C green was prepared on Mar 11,
2013. |
|
64
|
Monday, May 06, 2013, 14:34 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#04 - 05032013) | Monday, May 06, 2013, 14:29
UO2/C green was prepared on May 2,
2013 and let dry over the weekend. |
|
65
|
Thursday, May 30, 2013, 16:25 |
John Wong | UC2 | 39165-6 | LP-SIS | Done | Conditioning UCx#06 | Thursday, May 30, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2. |
|
67
|
Thursday, June 06, 2013, 16:56 |
John Wong | UC2 | 39165-6 | LP-SIS | Done | Conditioning UCx#06 |
|
|
69
|
Tuesday, June 25, 2013, 16:28 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
|
|
71
|
Thursday, July 11, 2013, 16:22 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
|
|
72
|
Monday, July 15, 2013, 09:45 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
|
|
74
|
Monday, August 05, 2013, 07:52 |
John Wong | UC2 | 38634-7 | LP-SIS | Done | Conditioning UCx # 07 |
|
|
75
|
Thursday, August 22, 2013, 18:00 |
John Wong | UO2/C | Target Boat #2 | | Done | Processing UC2 flaskes (batch#06 - 08222013 | Thursday, August 22, 2013, 17:31
1st attempt:
UO2/C green was prepared on Aug 14, |
|
76
|
Friday, August 23, 2013, 16:11 |
John Wong | UO2/C | Target Boat #2 | | Problems resolved | Processing UC2 flaskes (batch#06 - 08222013 |
|
|
79
|
Friday, September 20, 2013, 13:49 |
John Wong | UO2/C | Target Boat #2 | | Done | Processing UC2Flk_00 |
|
|
80
|
Friday, October 04, 2013, 15:56 |
John Wong | Empty | | LP-SIS | Done | Ignore this entry - Process was done in Evap2 | Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC. The container is wrapped with |
|
81
|
Friday, October 11, 2013, 18:10 |
John Wong | UC2 | 39814-IV | LP-IG-LIS | Done | UCx#8 - Final Conditioning | Friday, October 11, 2013, 18:00
|
|
89
|
Tuesday, March 04, 2014, 15:48 |
John Wong | | | TARGET BOAT | In progress | Re-sinterring end caps | Tuesday, March 04, 2014, 15:43
Theses endcaps (4) were previously
sinterred in Evap#2 but some surfaces were |
|
91
|
Wednesday, March 05, 2014, 23:05 |
John Wong | | | TARGET BOAT | Done | Re-sinterring end caps |
|
|
92
|
Monday, March 24, 2014, 17:53 |
John Wong | UO2/C | | TARGET BOAT | Done | Processing UC2Flk_02 | Monday, March 24, 2014, 17:50
UO2/C cast was prepared on March
21 and let dry over the weekend. The |
|
93
|
Wednesday, April 30, 2014, 14:58 |
John Wong | UC2 | 39165-9 | LP-SIS | Done | Conditioning UCx#9 | Wednesday, April 30, 2014, 14:50
The target container was previously
coated with TaC and sintered in Evap 2. |
|
94
|
Wednesday, May 21, 2014, 11:41 |
John Wong | UC2 | | TARGET BOAT | In progress | Tests: Sintering carbon Mesh coated with UC2 | Tuesday, May 20, 2014, 16:01
Target boat contains one pellet of
carbon mesh coated with UC2. The sample |
|
95
|
Friday, June 13, 2014, 15:21 |
John Wong | UC2 | 39165-10 | LP-SIS | Done | Conditioning UCx#10 | Friday, June 13, 2014, 15:02
Target container was previously coated
and sintered with TaC. It's wrapped |
|
96
|
Friday, July 04, 2014, 10:23 |
John Wong | ThO2 | 40282-2 | TARGET BOAT | Done | Test: Sintering ThO2 with Nb backing foils | Friday, July 04, 2014, 10:13
Target boat contains 4 set of samples.
Each sample consists of 5pack ThO2/Nb. |
|
98
|
Thursday, August 14, 2014, 17:56 |
John Wong | ThO2 | | LP-SIS | Done | Sintering ThO2#1 | Thursday, August 14, 2014, 17:54
Target container consists of 240
discs of ThO2/Nb discs. The container |
|
101
|
Friday, October 10, 2014, 14:00 |
John Wong | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_04 |
|
|
103
|
Monday, October 20, 2014, 16:22 |
John Wong | UC2 | 40282-5 | LP-SIS | Done | Conditioning UCx #11 |
|
|
113
|
Thursday, July 02, 2015, 13:01 |
John Wong | UC2 | 40860-1 | LP-IG-LIS | In progress | Conditioning UCx #13 |
|
|
115
|
Wednesday, July 08, 2015, 10:52 |
John Wong | UC2 | 40860-1 | LP-IG-LIS | Done | Conditioning UCx #13 |
|
|
116
|
Thursday, July 30, 2015, 17:19 |
John Wong | UO2/C | 40282-1 | TARGET BOAT | In progress | Processing UC2_flk_07 | Thursday, July 30, 2015, 17:10
The mixture of UO2/C was prepared
on July 13, 2015. See screen shot for |
|
120
|
Monday, September 14, 2015, 15:31 |
John Wong | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_09 | Monday, September 14, 2015, 15:28
Green cast dried UO2/C + organic |
|
121
|
Thursday, October 15, 2015, 16:05 |
John Wong | UC2 | 41077-5 | LP-SIS | In progress | Conditioning UCx#14 | Thursday, October 15, 2015, 15:52
Target container previously sintered
with TaC in Evap#2 - Target current at 440A, |
|
126
|
Friday, February 26, 2016, 10:27 |
John Wong | UC2 | 41077-1 | LP-SIS | In progress | Conditioning UCx#15 |
|
|
134
|
Tuesday, August 23, 2016, 17:35 |
John Wong | | | TARGET BOAT | | Sintering TaC coated target boat | Tuesday, August 23, 2016, 17:33
Target boat coated with TaC (sprayed)
and wrapped with Ta-heat shield. |
|
135
|
Monday, September 12, 2016, 17:41 |
John Wong | | | TARGET BOAT | In progress | RUSH. Sintering end-caps | Monday, September 12, 2016, 17:30
A bunch of end caps (12?) and a long
Ta-wire in spring sharp were coated |
|
140
|
Tuesday, November 15, 2016, 10:02 |
John Wong | UO2/C | 40282-1 | TARGET BOAT | In progress | Processing UC2Flk_13 |
|
|
213
|
Thursday, July 05, 2018, 13:43 |
John Wong | UC2 | | HP-FEBIAD-CTL | Done | Conditioning UCx#23 | Thursday, July 05, 2018, 13:24
Target container was previously coated
and sintered with TaC, also wrapped with |
|
214
|
Wednesday, July 11, 2018, 17:44 |
John Wong | UO2/C | | TARGET BOAT | Done | Processing UC2Flk_21 | Wednesday, July 11, 2018, 17:41
Cast prepared by Marla (see note
in Hotlab) |
|
215
|
Friday, August 03, 2018, 17:49 |
John Wong | UC2 | | LP-SIS | In progress | Conditioning UCx#24 | Friday, August 03, 2018, 17:44
Target consists of 230 UCx discs,
total packing length of 7.1cm. |
|
219
|
Saturday, September 29, 2018, 19:04 |
John Wong | UO2/C | | TARGET BOAT | In progress | Processing UC2_flk_22 | Saturday, September 29, 2018, 18:52
Cast is from Jar#1. (see process
sheet for details) |
|
220
|
Saturday, September 29, 2018, 20:53 |
John Wong | UC2 | 41369-2 | | Done | UCx Fully loaded graphite insert thermal test - FL#1.2 |
|
|
221
|
Thursday, October 11, 2018, 18:13 |
John Wong | UC2 | | LP-SIS | In progress | Conditioning UCx#25 | Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs,
total packing length of 8.0 cm. |
|
259
|
Tuesday, May 26, 2020, 20:44 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#33 Carbothermal Reduction | Tuesday, May 26, 2019,
18:20 |
|
262
|
Wednesday, June 03, 2020, 08:10 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 Carbothermal Reduction | Wednesday, June 03, 2020, 08:11
A loaded graphite cartridge |
|
272
|
Wednesday, June 30, 2021, 13:35 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 conditioning | Target
#34 was installed in the EVAP1 and pumped
down (Tuesday June 29, 2021). |
|
273
|
Wednesday, July 07, 2021, 12:40 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx Provisional ID= 200229 conditioning | Wednesday, July 07, 2021, 14:39
Target Provisional ID = 200929 |
|
275
|
Thursday, September 23, 2021, 07:03 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#35 C reduction | Thursday, September 23, 2021, 06:55
A loaded graphite cartridge |
|
281
|
Wednesday, June 01, 2022, 08:42 |
Darwin Ortiz Rosales | UO2/C | Target Boat | | Done | UO2 reduction Provisional ID C211209-1 | Wednesday, June 01, 2022, 08:39
A loaded graphite cartridge |
|
282
|
Friday, June 03, 2022, 06:21 |
Darwin Ortiz Rosales | UO2/C | 42218-4 | LP-IG-LIS | Done | UCx#39 reduction |
Friday, June 03, 2022, 06:24
|
|
283
|
Tuesday, June 07, 2022, 07:09 |
Darwin Ortiz Rosales | UO2/C | Target Boat | | Done | UO2 reduction ID C220510-1 | Tuesday, June 07, 2022, 07:05
A loaded graphite cartridge |
|
284
|
Friday, October 07, 2022, 08:14 |
Darwin Ortiz Rosales | UO2/C | | LP-SIS | Done | C-220928UCx conditioning experiments | Friday, October 07, 2022, 07:55
Cartridge-220928UCx was installed |
|
285
|
Wednesday, October 19, 2022, 12:28 |
Darwin Ortiz Rosales | UC2 | 40253-5 | LP TUBE | Done | C-220510 further conditioning | Wednesday, October 19, 2022, 10:27
Cartridge-220510Cx was installed |
|
286
|
Monday, November 28, 2022, 05:59 |
Darwin Ortiz Rosales | UO2/C | | LP-SIS | Done | C221125experiment | Monday, November 28, 2022, 05:58
Left weekend to pump down
current IGPI= 7.23e-7 Torr |
|
287
|
Monday, December 19, 2022, 10:45 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | C-221207 Reduction | Monday, December 19, 2022, 10:38
Cartridge with 175 discs (including
5 analysis discs) loaded into a graphite |
|
288
|
Thursday, January 19, 2023, 10:02 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | C230105 Reduction | Thursday, January 19, 2023, 09:57
Cartridge #8 loaded with 198 discs
To be reduced inside a Ta container |
|
289
|
Wednesday, March 22, 2023, 22:29 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | 230316 Reduction | Wednesday, March 22, 2023, 22:29
Cartridge #9 loaded with 213 plus
3 analysi discs |
|
290
|
Wednesday, October 11, 2023, 10:06 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | TUCx-231005 reduction & conditioning | Wednesday, October 11, 2023, 9:36
Cartridge #10 loaded with 213 plus
3 analysi discs |
|
291
|
Tuesday, April 09, 2024, 14:43 |
Darwin Ortiz Rosales | UO2 | | LP TUBE | Done | UCx240408 reduction | Tuesday, April 09, 2024, 14:42
Cartridge #16 loaded with 213 plus
3 analysi discs |
|
292
|
Thursday, September 12, 2024, 06:23 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | UCx240904 reduction |
Thursday, September 12, 2024, 06:19
Cartridge #19 loaded with 232 discs
including 5 analysis discs |
|
293
|
Tuesday, September 17, 2024, 06:49 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | UCx240916 reduction | Tuesday, September 17, 2024, 06:45
Cartridge #20 loaded with 224 discs
plus 3 analysis discs |
|
294
|
Thursday, September 19, 2024, 22:48 |
Darwin Ortiz Rosales | UO2/C | conditioning oven#3 | LP TUBE | Done | UCx240917 reduction | Thursday, September 19, 2024, 22:44
Cartridge #21 loaded with 211 discs |
|
295
|
Tuesday, January 14, 2025, 16:28 |
Darwin Ortiz Rosales | UO2/C | conditioning oven#3 | LP TUBE | In progress | UCx250113 reduction | Tuesday, January 14, 2025, 16:26
Cartridge #22 loaded with 211 discs |
|
30
|
Tuesday, August 30, 2011, 09:31 |
Anders Mjos | Empty | Target Boat | LP-SIS | Done | Sintering of End Caps | Tuesday, August 30, 2011, 09:29: Target
Boat wrapped with 3 Ta heat shields. 6 D-End
Caps and 6 End Caps coated with TaC. Pumping |
|
35
|
Wednesday, September 07, 2011, 15:40 |
Anders Mjos | Empty | | | Maintenance | Re-sealing of Glove Box | 2011-09-01:
Glove box was leaking
(air/argon) between base and box. Light was |
|
82
|
Friday, November 01, 2013, 13:08 |
Anders Mjos | | | | Maintenance | Gloves, window and window gasket replaced. | Work covered under work permit 2013-11-01-3
and performed by Anders and Rick with the
help of Danno (RPG). |
|
83
|
Monday, December 02, 2013, 16:09 |
Anders Mjos | | | | Problems resolved | TGHT connector repositioned and tightened | The right connector for the TGHT had rotated.
It has now been repositioned and both connectors
have been tightened to reduce the chance |
|
84
|
Monday, December 02, 2013, 16:10 |
Anders Mjos | | | | Done | Copper bar on TGHT | The conductivity of the TGHT circuit will
be measured with a copper bar shunt.
Monday, December 02, 2013, 16:00: |
|
119
|
Saturday, August 29, 2015, 16:12 |
Anders Mjos | | | | Problems | Restarting vacuum after power outage | Saturday, August 29, 2015, 16:10: Roughing
Saturday, August 29, 2015, 16:10:
Starting turbo |
|
218
|
Friday, September 21, 2018, 10:22 |
Anders Mjos | UC2 | 41369-2 | | Done | UCx Fully loaded graphite insert thermal test - FL#1.2 |
|
|
153
|
Wednesday, June 07, 2017, 12:48 |
Aaron Schmidt | | | | | Turbo pump cooling | Wednesday, June 07, 2017, 10:00-12:00:
Cooling was split/routed from two bottom
lines with tees and run to the turbo pump. |
|
165
|
Thursday, September 07, 2017, 14:26 |
Aaron Schmidt | | | | Maintenance | roughing pump oil replaced | Thursday, September 07, 2017, 11:00
-12:00
The roughing pump was disconnected |
|
166
|
Wednesday, September 20, 2017, 08:07 |
Aaron Schmidt | | | | Maintenance | Ion gauge & RP status | Wednesday, September 20, 2017, 08:00:
-A new ion gauge was installed yesterday
afternoon and the old one removed. The old |
|
212
|
Tuesday, June 26, 2018, 12:12 |
Aaron Schmidt | | | | Problems resolved | Gloves replaced. | Tuesday, June 26, 2018, 09:30. Gloves
on evap 1 changed out.
The original right one was otrn. |
|
233
|
Thursday, March 21, 2019, 09:03 |
Aaron Schmidt | | | | In progress | Evap 1 pump down issue | On Tuesday it was noted that evaporator
1 was not pumping down properly. It was vented
and the seal & seal face wiped with a |
|
234
|
Tuesday, March 26, 2019, 08:58 |
Aaron Schmidt | | | | Maintenance | Roughing pump oiled. | Oiled as per work permit: |
|
250
|
Tuesday, November 05, 2019, 14:50 |
Aaron Schmidt | | | | Maintenance | Fallen Bolt. | One of the TBHT bolts fell out of reach |
|
261
|
Monday, June 01, 2020, 09:29 |
Aaron Schmidt | | | | Problems | IEVAP:IGP1 swap out | Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips. |
|
260
|
Monday, June 01, 2020, 09:29 |
Aaron Schmidt | | | | Problems | IEVAP:IGP1 swap out | Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips. |
|
264
|
Tuesday, August 18, 2020, 12:40 |
Aaron Schmidt | | | | | IEVAP:IGP1 swap out | INIFICON - BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38: |
|
3
|
Monday, March 28, 2011, 11:20 |
| | | HP-FEBIAD | Done | Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) |
|
|
5
|
Tuesday, March 29, 2011, 10:20 |
| | | | Problems | Loss of cooling water | According to Jonathan Aoki, the electricians
will be servicing another MCC which will
result in loss of cooling water for about |
|
6
|
Tuesday, March 29, 2011, 10:30 |
| | | | Done | Loss of cooling water update | It's the NON-ACTIVE water that will go
off. The evaporator is on sity water,