5
|
Tuesday, September 25, 2012, 08:57 |
maicodallavalle | Elevation Jack | Maintenance | 2012 Service Maintance of #4 Station Jacking System | Shut down work for 2012.Replaced serviced
Jacking Station #6. Tapered alignment pins
were damaged. They were skimmed and checked |
|
6
|
Thursday, October 25, 2012, 13:58 |
maicodallavalle | Service Bridge | Maintenance | Orbit Drive | It was observed during the last time the
Cyclotron service bridge was used the orbit
drive chain had a lot of slack. The drive |
|
13
|
Wednesday, February 13, 2013, 08:55 |
maicodallavalle | Service Bridge | Repair | Service Bridge/Carrier Hydraulic Jacks | On Monday February 4TH the Service
Bridge was being lifted into the Cyclotron
with the Carrier. It was noticed that one |
|
25
|
Thursday, January 16, 2014, 08:46 |
maicodallavalle | Trolleys serviced | Maintenance | Pre Cyclotron work servicing and checking | This is a list of all the trolleys and
other equipment witch were checked and serviced
prior to work in the Cyclotron. |
|
47
|
Friday, January 23, 2015, 10:27 |
maicodallavalle | Elevation Jack | Maintenance | 2015 Jack Maintenance - Stations #4 and Station #9 | The Cyclotron Elevating System Shut Down
work done this year was done on Station #4
and Station #9. |
|
48
|
Monday, January 26, 2015, 07:57 |
maicodallavalle | Elevation Jack | Maintenance | Fall arrest Platform Railing | All of the Fall arrest Platform Railing
has been Collapsed for Cyclotron Lid up. |
|
62
|
Tuesday, March 17, 2015, 13:04 |
maicodallavalle | Cyclotron | Maintenance | Upper Bearings Station #5 and #10 | The Upper bearings on Station #5 and Station
#10 have been serviced. The Upper Bearing
were disassembled. The old gear was removed |
|
63
|
Thursday, March 19, 2015, 13:14 |
maicodallavalle | Shielding | Standard Operation | Remote Handling B2 level Shielding door | The Remote Handling B2 level Shielding
door has been closed. |
|
73
|
Tuesday, October 27, 2015, 07:50 |
maicodallavalle | Elevation Jack | Standard Operation | Service to Station # 9 Right side | Station #9 Cleaning of discoloration-
The right side Jack screw nut and
worm screw (mating parts in the right side |
9x |
76
|
Wednesday, January 27, 2016, 10:51 |
maicodallavalle | Elevation Jack | Maintenance | 2016 Cyclotron Elevation System Maintenance | The Cyclotron Elevating System Shut Down
work done this year was done on Station #9
and Station #10. |
|
109
|
Monday, February 19, 2018, 12:58 |
maicodallavalle | Trolley | Repair | Lift Trolley Repair | We had just finished pulling out the ladders
from the cyclotron with the lift trolley.
We started to run the lift trolley into the |
|
149
|
Thursday, February 02, 2023, 07:05 |
maicodallavalle | Service Bridge | Repair | Hinged Festoon Rail at Cyclotron | The Hinged section of the festoon rail
at Cyclotron has a piston to keep rail in
the up position for shutdown work (Bridge |
|
60
|
Monday, March 09, 2015, 11:55 |
chad fisher | Elevation Jack | Maintenance | Checking for contamination on fall arrest equip. | Fall equipment from the lockers in the
RH shop have been checked for contamination
and the lockers themselves have been swiped. |
|
61
|
Tuesday, March 10, 2015, 10:24 |
chad fisher | Elevation Jack | Maintenance | Contaminated equipment update | The harness, carabineer, and shock packed
used during the ISAC hot cell swipe have
been checked seperately by Mike and he has |
|
14
|
Wednesday, February 27, 2013, 12:08 |
Travis Cave | Cyclotron | Standard Operation | Installation of 2C | 2C has been installed located on all QDLs
and all the numbers, continuity check done
and passed. Bridge has been removed from |
|
15
|
Tuesday, March 05, 2013, 14:11 |
Travis Cave | Cyclotron | Standard Operation | Setup and the Installation of the HE 1 probe. | Setup of the HE 1 probe is difficult has
we have no mockup of it to properly setup
cameras and equipment for it. This is problem |
|
24
|
Monday, September 30, 2013, 14:02 |
Travis Cave | Service Bridge | Maintenance | new festooning | The festooning and bearings for the festooning
cars for both outriggers has been replaced
and it is in working order. |
|
26
|
Friday, January 17, 2014, 07:53 |
Travis Cave | Trolleys serviced | Standard Operation | Trolley checks | All trolleys work electrically and control
wise. One encoder was found non functioning
on the upper resonator trolley for the vertical |
|
29
|
Friday, January 24, 2014, 14:10 |
Travis Cave | Cyclotron | Standard Operation | Copper blockers | The copper blockers have been removed from
the cyclotron and placed into the coffins. |
|
30
|
Monday, January 27, 2014, 14:42 |
Travis Cave | Shielding | Standard Operation | shields and radiation survey | The cyclotron radiation survey was aborted
due to the orbit not working recording the
numbers correctly. One shield has been in |
|
31
|
Tuesday, January 28, 2014, 14:59 |
Travis Cave | Shielding | Standard Operation | shields | 200's, 400's, 500's, 600's, and a pallet
of 700's have been installed |
|
33
|
Thursday, January 30, 2014, 13:47 |
Travis Cave | Cyclotron | Standard Operation | shields | All shields, pothole covers, and ladders
have been installed into the cyclotron. |
|
34
|
Friday, January 31, 2014, 10:07 |
Travis Cave | Cyclotron | Standard Operation | 2C removal | 2C has been successfully removed from the
cyclotron and is now currently sitting in
the B2 level of the RH building. A tank access |
|
35
|
Friday, February 07, 2014, 10:50 |
Travis Cave | Cyclotron | Standard Operation | 2C install | 2C has been installed into the cyclotron. |
|
38
|
Tuesday, February 25, 2014, 15:00 |
Travis Cave | Shielding | Standard Operation | shields | Started on the removal of shields. |
|
39
|
Wednesday, February 26, 2014, 14:55 |
Travis Cave | Shielding | Standard Operation | shields | More shields have been removed from the
cyclotron only 16 remain. I was also noted
that the lift trolley is making an odd noise |
|
40
|
Monday, March 03, 2014, 13:09 |
Travis Cave | Cyclotron | Standard Operation | shields | all shields, porthole covers and ladder
out and copper blockers in. Some conmination
was found on the pads of the ladders (about |
|
42
|
Tuesday, April 08, 2014, 10:45 |
Travis Cave | Shielding | Standard Operation | Large shield door on the RH B2 level | The large shield door on the RH B2 level
of the remote handling building has been
shut. |
|
50
|
Tuesday, January 27, 2015, 14:40 |
Travis Cave | Cyclotron | Standard Operation | Day one of in tank work | Day one of RH in tank work for the cyclotron
(shields and blockers stuff like that) many
pictures were taken. |
|
51
|
Wednesday, January 28, 2015, 14:33 |
Travis Cave | Cyclotron | Standard Operation | Day two of in tank work | All copper blocker removed from the cyclotron
and first radiation survey done. Shields
start tomorrow. |
|
52
|
Thursday, January 29, 2015, 14:53 |
Travis Cave | Cyclotron | Standard Operation | Day three of in tank work | Over 50% of the shields are in some 700's
left and the monitor box covers. |
|
53
|
Friday, January 30, 2015, 15:02 |
Travis Cave | Cyclotron | Standard Operation | Day four of in tank work | All shields, ladders and pothole covers
are in. One rad survey left to do. |
|
54
|
Monday, February 02, 2015, 14:28 |
Travis Cave | Cyclotron | Standard Operation | Day five of in tank work | Final Radiation Survey done. All in tank
work completed bridge removed from the tank. |
|
55
|
Wednesday, February 04, 2015, 13:57 |
Travis Cave | Cyclotron | Standard Operation | 2C removal | 2C has been removed from the cyclotron. |
|
57
|
Tuesday, February 17, 2015, 11:28 |
Travis Cave | Cyclotron | Standard Operation | 2C Installation | 2C extraction probe has been re-installed
in the cyclotron. After some problems on
the first install attempt, do to a busted |
|
58
|
Friday, March 06, 2015, 14:38 |
Travis Cave | Cyclotron | Standard Operation | Shield Removal | All shields and ladders have been removed
from the tank, all the port holes have been
uncovered, the tank seal has been vacuumed, |
|
66
|
Friday, March 27, 2015, 11:25 |
Travis Cave | Cyclotron | Standard Operation | Copper Blockers | Copper Blockers have been removed from
the cyclotron and one ladder has been installed. |
|
74
|
Tuesday, January 05, 2016, 09:58 |
Travis Cave | Cyclotron | Standard Operation | Opened the shield door | The shield door on the B2 level has been
opened. |
|
78
|
Friday, February 05, 2016, 14:55 |
Travis Cave | Shielding | Standard Operation | shadow shields | all 200, 400, 500, 600, and some 700 series
of shield are in. |
|
79
|
Friday, February 05, 2016, 14:57 |
Travis Cave | Service Bridge | Maintenance | outrigger problem | outrigger 1 had a power failure, bridge
was removed power restored and outrigger
parked, outrigger will be looked at once |
|
80
|
Tuesday, February 09, 2016, 14:48 |
Travis Cave | Cyclotron | Standard Operation | shadow shields | All shadow shields have been installed.
Ladders, the pothole covers and the second
rad survey will be done tomorrow. |
|
81
|
Wednesday, February 10, 2016, 14:53 |
Travis Cave | Cyclotron | Standard Operation | shadow shields | All cyclotron in tank work is completed. |
|
84
|
Thursday, February 25, 2016, 11:41 |
Travis Cave | Cyclotron | Standard Operation | Ex 2C removal | Ex 2C has been removed from the cyclotron.
A trip into the tank was needed to free the
probe, hung up on the usual spot. |
|
85
|
Tuesday, March 01, 2016, 13:27 |
Travis Cave | Cyclotron | Standard Operation | Ex 2C install | EX 2C has been installed back into the
cyclotron. |
|
88
|
Thursday, April 07, 2016, 11:04 |
Travis Cave | Cyclotron | Standard Operation | Closed the shield door | The shield door on the B2 level of the
RH building has been closed. |
|
91
|
Tuesday, January 31, 2017, 14:41 |
Travis Cave | Cyclotron | Standard Operation | Shield installation | 200, 400, 500, 600, and a pallet of 700
series of shield have been installed in the
cyclotron. |
|
105
|
Tuesday, January 16, 2018, 13:43 |
Travis Cave | Cyclotron | Standard Operation | Cyclotron in tank work | All cyclotron in tank work has been
completed. |
|
111
|
Tuesday, April 03, 2018, 11:57 |
Travis Cave | Cyclotron | Standard Operation | Blue Shield Door Shut. | The Blue Shield Door on the B2 level
of the RH building has been closed. |
|
136
|
Wednesday, January 19, 2022, 09:50 |
Travis Cave | Shielding | Standard Operation | Shield door is now open | The shield door is now open on the
RH B2 level. |
|
86
|
Wednesday, March 09, 2016, 17:09 |
Ron Kuramoto | Cyclotron | Development | EX4N new housing installation | The new EX4N housing assembly drawing TEC0071
(unfinished) was installed and connected
to the EX4 tank side port flange over a 3 |
|
175
|
Tuesday, May 14, 2024, 10:53 |
Riley Sykes | Carrier | Maintenance | Carrier underrail wheels maintenance | All 4 Under rail wheels serviced
and cleaned. All Timken bearings repacked
with grease. No defects in any bearing set. |
|
176
|
Thursday, May 16, 2024, 12:33 |
Riley Sykes | Service Bridge | Maintenance | Center Post Bearing | Center post bearing on service bridge
inspected, turned freely by hand and regreased
with Molub-Alloy 777-1 ES |
|
177
|
Friday, May 31, 2024, 08:57 |
Riley Sykes | Carrier | Maintenance | Carrier Drive motor/gear reducer | Motor/Gearbox unit removed from carrier
and fully inspected and serviced. Oil changed
on May 29th using Mobil 600 W Super Cylinder |
|
178
|
Friday, May 31, 2024, 11:28 |
Riley Sykes | Service Bridge | Maintenance | Outrigger mechanical inspection | Both outriggers were inspected and
were found to be mechanically sound. No damage
to components or hardware visible, will revisit |
|
179
|
Friday, May 31, 2024, 12:47 |
Riley Sykes | Trolleys serviced | Maintenance | Tool Trolley Scheduled Maintenance | 60 month service completed. Bearings
for drive motor wheels regreased, Reducer
repacked with Molub Alloy 777-1 ES, |
|
180
|
Monday, June 03, 2024, 14:29 |
Riley Sykes | Trolleys serviced | Maintenance | Upper Resonator Trolley | 24 Month, 60 month
service completed. Bearings for drive motor |
|
181
|
Tuesday, June 04, 2024, 14:29 |
Riley Sykes | Trolleys serviced | Maintenance | Lower Resonator Trolley | 12, 24 and 60 |
|
182
|
Wednesday, June 12, 2024, 10:35 |
Riley Sykes | Trolleys serviced | Maintenance | Outriggers 1 and 2 Service | 1,2 and 5 Year service completed.
Vertical ball screws and chains inspected
and regreased with Chemours Krytox EG 2000 |
|
183
|
Friday, June 14, 2024, 10:04 |
Riley Sykes | Service Bridge | Maintenance | Service/ Bridge inspection | Yearly, 2 Year and 5 Year service
completed. All bearings on support frames
turn freely and were regreased with Molub |
|
184
|
Monday, June 24, 2024, 12:53 |
Riley Sykes | Elevation Jack | Maintenance | Highfield Service | Highfields 7A,7B post shutdown service
complete. Oil change completed, new Mobil
600 W Super Cylinder oil added. Sample collected |
|
186
|
Tuesday, July 23, 2024, 13:27 |
Riley Sykes | Carrier | Maintenance | Service/Maintenance checks | 1,2, 5 Year Service and maintenance
package completed on Carrier. All reducers
repacked with Molub-Alloy 777-1 ES grease. |
|
188
|
Wednesday, July 24, 2024, 14:26 |
Riley Sykes | Elevation Jack | Maintenance | Service inspection and relubrication | Jack 7R pulled apart and inspected
for deficiencies, all parts deemed to be
in working order, jack was rebuilt and lubricated |
|
189
|
Wednesday, August 07, 2024, 14:24 |
Riley Sykes | Elevation Jack | Maintenance | Service inspection and relubrication | Jack 7L pulled
apart and inspected for deficiencies, alignment |
|
142
|
Tuesday, May 10, 2022, 11:26 |
Nadia Jorgenson | Cyclotron | Repair | Festooning rail rope and pulley system re-routed | The rope and pulley system that is used
to raise the festooning rail across the vault
shield door has been re-routed. It now makes |
|
143
|
Tuesday, May 10, 2022, 11:30 |
Nadia Jorgenson | Cyclotron | Repair | Cracked Festooning Rail Bushing Removed | We removed the left bushing that
is around the air cylinder on the festooning
rail, right outside the cyclotron. It was |
|
144
|
Tuesday, May 10, 2022, 11:31 |
Nadia Jorgenson | Cyclotron | Standard Operation | Vault Shield Door Closed | The vault shield door
has been closed and seal inflated. The operation |
|
151
|
Tuesday, March 28, 2023, 12:02 |
Nadia Jorgenson | Service Bridge | Repair | Outrigger 1 Failure and Repair |
During
the 2023 shutdown outrigger 1 failed. While |
|
160
|
Tuesday, November 14, 2023, 12:13 |
Nadia Jorgenson | Service Bridge | Repair | First Festooning Car "H" channel replacement | Damaged "H" channel removed
from the first festooning car, and spare
channel was put in place. |
|
161
|
Tuesday, November 14, 2023, 12:38 |
Nadia Jorgenson | Service Bridge | Maintenance | Bridge Orbit Counter Work in 2023 | All the bearings on both
the upper and lower wheel were replace to |
|
103
|
Monday, January 08, 2018, 09:04 |
Maico Dalla Valle / Jason Kapalka | Cyclotron | Standard Operation | Cyclotron Lid Up | Remote Handing is ready for January, 8 2018
Cyclotron lid up. Elevating system service
has been completed.
|
|
1
|
Monday, June 27, 2011, 10:38 |
John Wong | General | Routine | Testing RH elog | |
|
156
|
Thursday, September 07, 2023, 13:21 |
Jason Zhang | Service Bridge | Development | Outrigger #1 and #2 individual testing complete | Outrigger #1 and #2 have had their controls
system overhauled as part of the O503 project.
The previous controls enclosure and the elements |
|
159
|
Wednesday, October 18, 2023, 12:35 |
Jason Zhang | Service Bridge | Development | O503 Bridge and Outrigger integration testing | Service bridge, Outrigger #1, and
Outrigger #2 have had the controls system
migrated to PLC controls. The 5069-AENTR |
|
92
|
Monday, February 06, 2017, 20:32 |
Jason Kapalka | Elevation Jack | Maintenance | 2017 Cyclotron Elevating System Maintenance | The Cyclotron Elevating System planned maintenance
work this year was performed on Jack Station
#3, #8, #9, and #10.
|
|
95
|
Tuesday, February 28, 2017, 15:45 |
Jason Kapalka | Cyclotron | Standard Operation | 2C extraction probe removal and reinstallation | 2C extraction probe was removed from cyclotron
tank on 2017-02-07 by RH and Probes group
members with service
|
|
96
|
Friday, March 03, 2017, 13:30 |
Jason Kapalka | Cyclotron | Standard Operation | CP continuity test | Performed continuity test at Cyclotron center
post with RH and Operations group members
using the service bridge,
|
|
97
|
Tuesday, March 07, 2017, 09:31 |
Jason Kapalka | Shielding | Standard Operation | Blockers/Shields/Covers/Ladders | The seven copper blockers were removed from
the Cyclotron tank by the RH group using
the service bridge, lift
|
|
98
|
Tuesday, March 14, 2017, 11:23 |
Jason Kapalka | Cyclotron | Standard Operation | Start/end of shutdown photo and video survey | The start of shutdown photo and video survey
was performed in the Cyclotron tank by the
RH group using the
|
|
99
|
Tuesday, March 14, 2017, 12:02 |
Jason Kapalka | Cyclotron | Standard Operation | Radiation survey | The unshielded radiation survey was performed
in the Cyclotron tank by the RH group using
the service bridge,
|
|
100
|
Tuesday, March 14, 2017, 17:07 |
Jason Kapalka | Probe | Maintenance | LE probe removal simulation exercise | A simulated removal of the LE2 Probe from
the Cyclotron tank was performed by the RH
and Probes group using the
|
|
101
|
Tuesday, March 14, 2017, 17:28 |
Jason Kapalka | Cyclotron | Maintenance | Lower resonator removal simulation exercice | A simulated removal of a lower resonator from
the Cyclotron tank was attempted by the RH
group using the
|
|
102
|
Tuesday, March 14, 2017, 17:57 |
Jason Kapalka | Cyclotron | Standard Operation | Lid raising and lowering operations | Lid up (Attempt #1)
Pre-indexed
|
|
104
|
Tuesday, January 09, 2018, 15:54 |
Jason Kapalka | Cyclotron | Standard Operation | Lid-up sequence (in-tank work) | 2018-01-09
07:00-10:00 - Pre-job meeting, informed main
control room of operation startup, lowered |
|
110
|
Friday, February 23, 2018, 15:44 |
Jason Kapalka | Elevation Jack | Repair | Replacement of Elevating System wiring | On January 8, 2018, while troubleshooting
the Cyclotron Elevating System during the
lid-up operation, the
|
|
21
|
Monday, March 18, 2013, 15:12 |
Isaac Earle | Cyclotron | Maintenance | Cyclotron Magnet Face Gap Measurements | Measurements of the cyclotron magnet face
gap were taken on March 15, 2013 at two locations
around the tank with the cyclotron lid in |
8x |
71
|
Wednesday, September 30, 2015, 11:26 |
Isaac Earle | Elevation Jack | Standard Operation | Station 9 Jack Right Side - Unusual Wear Investigation | The following people were consulted
regarding the unusal wear noticed on jack
station #9 right side |
7x |
72
|
Wednesday, September 30, 2015, 11:52 |
Isaac Earle | Elevation Jack | Standard Operation | Station 9 Jack Left Side - Inspection & Service Status | The left side jack was disassembled and
cleaned. It was discovered that the
left side had been rebuilt with a new jack |
15x |
82
|
Tuesday, February 16, 2016, 16:32 |
Isaac Earle | Cyclotron | Standard Operation | HE1 Probe Removed from Cyclotron | The HE1 Probe was removed from the cyclotron
this morning following the procedure in Document-126165
(currently in draft status, to be released |
|
83
|
Friday, February 19, 2016, 10:17 |
Isaac Earle | Cyclotron | Standard Operation | HE1 Probe Installed in Cyclotron | The HE1 Probe was reinstalled into
the cyclotron this morning following Section
3.2 in Document-126165 (to be reviewed and |
|
93
|
Thursday, February 09, 2017, 15:21 |
Isaac Earle | Cyclotron | Standard Operation | HE2 Probe Removed | The HE2 probe was
removed from the cyclotron today following |
|
94
|
Tuesday, February 21, 2017, 13:40 |
Isaac Earle | Cyclotron | Standard Operation | HE2 Probe Returned to Cyclotron | The HE2 probe was reinstalled in
the cyclotron this morning following the
procedure in Document #126165. An orbital |
|
106
|
Thursday, January 25, 2018, 17:16 |
Isaac Earle | Cyclotron | Standard Operation | HE1 probe removed | The HE1 probe was removed from the
cyclotron today using the procedure in Document
126165. The reason for removal is so |
|
107
|
Wednesday, January 31, 2018, 11:20 |
Isaac Earle | Cyclotron | Standard Operation | HE1 probe reinstalled | HE1 probe was reinstalled in the
cyclotron this morning as per the procedure
in Document 126165. Hardware for the |
|
2
|
Tuesday, February 07, 2012, 18:09 |
Grant Minor | Service Bridge | Repair | Service Bridge Center Post Bearing Maintenance and Orbit Counter (2011/2012) | Repair
of Orbit Limit Switch Plastic Belt
During |
|
3
|
Tuesday, February 14, 2012, 15:40 |
Grant Minor | Trolley | Standard Operation | 2C Removal - all 4 QDLs were actuated remotely this year! | Today Remote Handling staff (Maico Dalla
Valle, Travis Cave) used the Remote Handling
2C probe removal trolley to remove the probe |
|
7
|
Tuesday, January 29, 2013, 18:49 |
Grant Minor | Elevation Jack | Standard Operation | Lid-up complete - summary notes | Lid-up was first attempted yesterday (Jan
28th) by Dan Louie, Arthur Leung, and Maico
Dalla Valle. They experienced problems |
|
8
|
Wednesday, January 30, 2013, 14:44 |
Grant Minor | Elevation Jack | Standard Operation | Further lid-up notes from Dan Louie | Dan Louie's e-mail comments from 30 Jan
2013 are attached.
- Grant |
|
9
|
Monday, February 04, 2013, 13:52 |
Grant Minor | Service Bridge | Repair | Hydraulic cylinder failure on service bridge | The hydraulic cylinder on the West side
of the service bridge (used to raise the
bridge for insertion into the Cyclotron) |
6x |
10
|
Wednesday, February 06, 2013, 17:42 |
Grant Minor | Elevation Jack | Maintenance | In-situ jack power screw lubrication inspection - Stations 9, 10, 11, and 6 | Due to concerns raised regarding the state
of the lubrication of the power screws at
Station 9, the lubrication was visually inspected |
16x |
11
|
Wednesday, February 06, 2013, 17:50 |
Grant Minor | Elevation Jack | Maintenance | Service records compiled by G. Minor | Attached is a compiled record showing the
years of service of the jacks, upper bearing,
and gear reducers, prepared by Grant Minor |
|
12
|
Wednesday, February 06, 2013, 18:07 |
Grant Minor | Elevation Jack | Maintenance | Lid-down yoke gap measurements from 1994 | Attached is a scan of a handwritten record
from 1994 showing yoke-to-upper-structure
gap measurements from 1994, both L and R |
|
16
|
Friday, March 08, 2013, 18:42 |
Grant Minor | Cyclotron | Repair | Tank lid not at upper limit and resulting effects | This morning during routine service bridge
work in the Cyclotron tank, it was observed
by Travis Cave that the cable tray for the |
|
17
|
Monday, March 11, 2013, 19:43 |
Grant Minor | Cyclotron | Repair | Adjustment of tank lid upper limit by 1/4" upwards | This morning Don Jackson commented to Grant
Minor that he believed the tank lid was still
not raised high enough to safely operate |
|
18
|
Thursday, March 14, 2013, 19:57 |
Grant Minor | Cyclotron | Repair | Tank lid upper / over travel limit check | Today Grant Minor, Dan Wright, Arthur Leung,
and Dan Louie checked the height difference
between the tank lid upper travel limit switch |
|
20
|
Friday, March 15, 2013, 15:18 |
Grant Minor | Cyclotron | Standard Operation | Lid Down Successful - Mechanical Counter Readings | Prior to the lid-down operation today,
the Cyclotron was lowered by 0.75" and
then raised again to confirm that the upper |
|
22
|
Tuesday, March 19, 2013, 19:17 |
Grant Minor | Elevation Jack | Standard Operation | Re-indexing of all jack station "zero" yoke elevations | The dimension between the yokes and the
Cyclotron upper structure primary beams was
set to .25" nominal at all jack stations |
|
23
|
Thursday, April 11, 2013, 19:00 |
Grant Minor | Elevation Jack | Maintenance | Upper Bearing at Jack Station 9 + Fall Protection Upgrades | There was a brief access period to the
Cyclotron vault during April 9 to 12, 2013
due to other Cyclotron issues. |
|
27
|
Monday, January 20, 2014, 12:00 |
Grant Minor | Elevation Jack | Standard Operation | Indexing Check of Cyclotron Jack Stations | Maico Dalla Valle and Grant Minor, supported
by Dan Louie and Arthur Leung, entered the
Cyclotron Vault on January 15th, 2014 to |
|
28
|
Thursday, January 23, 2014, 18:47 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up Report - 22 Jan 2014 | Yesterday Grant Minor (me), Maico Dalla
Valle, Dan Louie, and Arthur Leung worked
with Operations to perform the Cyclotron |
6x |
41
|
Monday, March 03, 2014, 15:07 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Down Report Monday 3-March-2014 | The Cyclotron Lid Down was successfully
completed today on Work Permit C2014-03-03-6.
The system only tripped twice on |
|
44
|
Wednesday, July 02, 2014, 16:46 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up Report for 27 June 2014 | The cyclotron lid was raised on June 27th,
2014. Start time was 1:05pm end time
was 2:17pm (good!) Dan McDonald collected |
|
46
|
Tuesday, January 13, 2015, 16:46 |
Grant Minor | Elevation Jack | Development | Upper Bearing Fall Protect Guardrails TRH1217 Installed on Stns 8,10, 3, 4 & 5 | 5 x TRH1217 Upper Bearing Service Platform
assemblies were installed between January
6th and January 13th at Stations 8, 10, 3, |
9x |
49
|
Tuesday, January 27, 2015, 11:39 |
Grant Minor | Elevation Jack | Standard Operation | Lid-Up Report 26 Jan 2015 |
Normal
0
|
|
59
|
Friday, March 06, 2015, 16:42 |
Grant Minor | Elevation Jack | Standard Operation | Lid-Down Report 6-March-2015 | Lid down started around 2:30 pm today (March
6th, 2015)
Master Start: 47422 |
|
64
|
Thursday, March 26, 2015, 15:48 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up 26 March 2015 | Lid was raised today (2nd time during 2015
shutdown) for additional inflector work.
Dan and Maico report that the lid |
|
68
|
Thursday, April 16, 2015, 15:26 |
Grant Minor | Elevation Jack | Maintenance | Cyclotron Elevating System Maintenance Rotation Record - Updated 16 Apr 2015 | |
|
70
|
Thursday, September 17, 2015, 18:38 |
Grant Minor | Elevation Jack | Maintenance | Station 9 Jack Worm Gear Inspection - unusual wear markings 16Sept2015 | Unusual wear markings were observed on
the Station 9 jack (not sure if L or R jack?)
during a visual inspection. |
8x |
75
|
Tuesday, January 19, 2016, 17:59 |
Grant Minor | Elevation Jack | Development | Upper Bearing Fall Protection Installation - Stations 1, 2, 6, 7, 8, 11, & 12 | The installation of the upper bearing fall
protection equipment was completed last week
by Dan and Maico. |
22x |
150
|
Friday, February 03, 2023, 08:27 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System Jack Inspection | Annual Jack Inspection: The annual
elevation system inspection has been completed
(Jan 31,2023). |
|
164
|
Wednesday, January 31, 2024, 15:06 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System - Annual Station Swap 2023-2024 | The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322,
Work done after electrical lockout |
|
4
|
Friday, February 17, 2012, 15:07 |
Don Jackson | Trolley | Repair | Video Trolley Failed in Cyclotron Tank | All control to the video trolley was lost
during remote photographing of components
in the cyclotron. The control system and |
|
19
|
Friday, March 15, 2013, 08:39 |
Don Jackson | Cyclotron | Standard Operation | Pre Lid Down In Tank Video Survey | In tank survey completed. A few items
of interest were found. Ladders need
to moved manually outboard to #5 resonators |
|
108
|
Friday, February 02, 2018, 14:14 |
Don Jackson | Trolley | Repair | Overcurrent on radial drive motor |
|
|
43
|
Monday, April 28, 2014, 10:20 |
Dan McDonald | Service Bridge | Maintenance | Bridge orbit reduction box | Noticed oil leaking out of reduction box,
scan and swipe, disconnect e motor and all
related cables from bridge, remove motor |
|
45
|
Friday, July 04, 2014, 07:21 |
Dan McDonald | Elevation Jack | Standard Operation | Cyclotron lid down July-2- 2014 | Cyclotron lid down was successfully completed
on July 2 2014. Lid went partially down before
jack nine had to be jogged to catch up to |
|
56
|
Tuesday, February 17, 2015, 07:10 |
Dan McDonald | Trolleys serviced | Maintenance | Pre shut down trolley service | Routine maintenance as per Mike Gallop's
written procedure took place in December
with the only non routine service being the |
|
65
|
Friday, March 27, 2015, 07:31 |
Dan McDonald | Cyclotron | Repair | Lid up operations | Lid up recap for March 26th 2015.
Start time 14:50 |
|
67
|
Thursday, April 02, 2015, 12:09 |
Dan McDonald | Cyclotron | Standard Operation | Lid Down operations April, 2, 2015 | Lid down Start at 11:17, lid went down
without any issues or stop's. Lid finish
at 11:45 |
|
69
|
Tuesday, July 28, 2015, 11:47 |
Dan McDonald | Trolley | Maintenance | Camera trolley service | Serviced the Camera trolley this morning
as per Mike Gallops service outline. |
|
77
|
Wednesday, February 03, 2016, 08:16 |
Dan McDonald | Cyclotron | Standard Operation | Cyclotron lid up | Lid up procedure Started at 12:00pm.
Initial numbers. # 1-47,2-49,3-45,4-47,5-47,6-47,7-49,8-45,9-50,10-50,11-51,12-49.
After a number of unsuccessful attempts at |
|
87
|
Tuesday, March 15, 2016, 13:56 |
Dan McDonald | Cyclotron | Standard Operation | Lid Down 2016 | Lid down Started at 12:15, station and
count numbers. Lid went down with out incident
as station 1 and 7 show the counters will |
|
89
|
Thursday, June 30, 2016, 13:47 |
Dan McDonald | Trolley | Maintenance | Lift trolley | Maintenance has been performed on the lift
trolley, re sealed the main drive gear box
it was quite dry inside and in need of new |
|
90
|
Wednesday, September 14, 2016, 11:30 |
Dan McDonald | Elevation Jack | Maintenance | Jack station 10B | Annual jack maintenance : Jack 10b upon
inspection it was found that the output shaft
seal on 10b was in need of replacement. In |
14x |
112
|
Tuesday, January 22, 2019, 07:18 |
Dan McDonald | Elevation Jack | Maintenance | Station 11-12 jack swap and hoist plate instal | Prior to commencing work on jacking stations
we installed a wall mounted come along plate
as per Jason kapalkas instructions |
|
115
|
Thursday, January 30, 2020, 06:55 |
Dan McDonald | Cyclotron | Standard Operation | Lid up operations | Lid up operations took place on January
21st starting at 10:25 lid went up without
issue. Couple things to note are station |
|
120
|
Saturday, April 04, 2020, 09:47 |
Dan McDonald | Cyclotron | Standard Operation | Lid down operations | Lid down operations for 2019/2020 shutdown
went ahead as planned on March 10th 2020
with Dan Louie and Arthur Leung absent due |
|
121
|
Saturday, April 04, 2020, 10:03 |
Dan McDonald | Trolley | Development | Addition of DC motor controller mounts | Upper and lower resonator trolleys received
mounting plates and brackets to accommodate
DC motor controls for updated drive motors. |
|
122
|
Sunday, April 05, 2020, 13:24 |
Dan McDonald | Elevation Jack | Maintenance | Elevating system station swap 2019-2020 | Station 11-12 where swapped for station
13-14 during 2018-2019 shutdown. Once lock
out and motor disconnect was complete we |
|
32
|
Wednesday, January 29, 2014, 15:08 |
Bevan Moss | Cyclotron | Standard Operation | Shielding and Port Hole Covers | The Shielding and the Port Hole Covers
have all been installed. No issues with the
installation have caused any problems. This |
|
36
|
Friday, February 21, 2014, 11:05 |
Bevan Moss | Cyclotron | Standard Operation | Old Monitor Box Removed, New installed | One of the beam spill monitor boxes
was removed and placed into a lead coffin.
The fields around the coffin prior to the |
7x |
37
|
Friday, February 21, 2014, 15:58 |
Bevan Moss | Cyclotron | Standard Operation | Old Monitor Box Removed, New installed | During the electrical test the was no contact.
To help investigate further the Montitor
box was removed from the Cyclotron. It was |
|
113
|
Wednesday, September 04, 2019, 15:29 |
Adam Newsome | Trolley | Maintenance | Connector faceplate and tubing upgrade | Tool Trolley:
The connector faceplate was replaced
with a new version to allow for more space |
|
114
|
Thursday, October 31, 2019, 14:31 |
Adam Newsome | Service Bridge | Repair | Outrigger 2 Vertical Drive Repair | Outrigger 2 vertical drive repair is complete
- ball screws were replaced to resolve a
jamming issue (this work was done in the |
|
116
|
Monday, February 03, 2020, 11:06 |
Adam Newsome | Cyclotron | Development | Porthole Cover Handling Tool - Initial Test Report | The suction-cup based porthole cover handling
tool (TRH1366) was tested for the first time
inside the cyclotron as part of the regular |
|
117
|
Wednesday, February 05, 2020, 12:37 |
Adam Newsome | Cyclotron | Development | Cyclotron Vacuum Cleaning Tool - Initial Test | The vacuum cleaning tool (TRH1366, vacuum
cleaning configuration) was tested in the
cyclotron tank. The following test were performed: |
|
118
|
Wednesday, February 05, 2020, 12:44 |
Adam Newsome | Cyclotron | Development | Cyclotron Small Object Retrival Tool - Intial Test | The small object retrieval tool was tested
in the cyclotron tank for the first time.
At this time, there are no known accessible |
|
119
|
Wednesday, February 05, 2020, 15:04 |
Adam Newsome | Trolley | Repair | Upper resonator trolley: cylinders for Ex 2C tasks | [B]Cylinder 4[/B] on the upper resonator trolley
was not fully functional when removing Ex
2C during 2020 shutdown. It worked occasionally. |
|
123
|
Thursday, July 16, 2020, 11:57 |
Adam Newsome | Cyclotron | Development | Cyclotron Mockup: Orbital Position Pendant Upgrade | The pendant used for controlling the orbital
motion of the bridge mockup was upgraded.
Features of the new pendant include: |
|
124
|
Thursday, November 05, 2020, 15:38 |
Adam Newsome | Infrastructure | Development | New crane pendant: B1 level crane | A new remote crane pendant was installed
to replace the existing wired pendant on
the B1 level of Remote Handling building |
|
125
|
Monday, November 09, 2020, 09:17 |
Adam Newsome | Infrastructure | Development | New crane pendant: B2 level crane | A new remote crane pendant was installed
to replace the existing wired pendant on
the B2 level of Remote Handling building |
|
126
|
Wednesday, January 13, 2021, 11:35 |
Adam Newsome | Shielding | Maintenance | Shadow Shields Inspection - 2021 Shutdown | All shadow shields which are remotely placed
inside the cyclotron during shutdown were
inspected by Adam Newsome and Chris Peterson |
|
127
|
Friday, January 22, 2021, 14:30 |
Adam Newsome | Cyclotron | Standard Operation | Lid up operation - 2021 | The lid
up operation took place on Jan. 22, 2021.
The |
|
128
|
Wednesday, February 03, 2021, 12:37 |
Adam Newsome | Cyclotron | Development | Ladder Handling Tool - First In-Tank Test (SAS0824) | The newly developed Ladder Handling Tool
(TRH1401), which is used to move the maintenance
ladders from the #5 resonator area closer |
|
129
|
Friday, February 26, 2021, 08:29 |
Adam Newsome | Trolleys serviced | Maintenance | First Turn Radial Flag (FTRF) Jig - Pneumatic Upgrade | Old fittings and broken pneumatic tubing
on the FTRF jig have been replaced with new
push-connect fittings and polyurethane tubing. |
|
130
|
Friday, February 26, 2021, 13:00 |
Adam Newsome | Trolleys serviced | Maintenance | Lower Resonator Trolley - Radial Drive Failure Issue | On Feb. 24 while practising a training
exercise, the lower resonator trolley unexpectedly
experienced a radial drive failure. The trolley |
|
131
|
Thursday, April 01, 2021, 13:47 |
Adam Newsome | Cyclotron | Standard Operation | Vault Shield Door Closed | The vault shield door has been closed and
seal inflated. The operation was performed
with no issue. |
|
132
|
Tuesday, April 20, 2021, 15:02 |
Adam Newsome | Carrier | Development | Emergency Trolley Rescue Winch: Installed and Tested | An emergency trolley rescue winch (TRH1527)
was developed for the purposes of retrieving
trolleys from the cyclotron tank whose radial |
|
133
|
Wednesday, May 05, 2021, 12:20 |
Adam Newsome | Infrastructure | Development | Cyclotron RH Control Room: Outlets Installed | The following outlets were installed by
Electrical Services Group in order to facilitate
upgrading power supplies for Cyclotron Remote |
|
134
|
Wednesday, June 16, 2021, 09:59 |
Adam Newsome | Service Bridge | Development | Bridge Lift Mechanism Refurbishment (Phase 1 of 2) - Complete | The following items from Phase 1 of 2 of
Bridge Lift Mechanism Refurbishment (O504)
are complete: |
|
135
|
Tuesday, August 31, 2021, 14:28 |
Adam Newsome | Trolleys serviced | Development | Upper Resonator Trolley - Finger Cylinders Replaced | The two support fingers on the upper resonator
trolley were bent due to excessive loading
during cylinder toggling. |
|
137
|
Friday, February 04, 2022, 11:52 |
Adam Newsome | Cyclotron | Standard Operation | Lid up operation - 2022 | The lid up operation
took place on Feb. 4, 2022. |
|
138
|
Tuesday, February 08, 2022, 11:39 |
Adam Newsome | Cyclotron | Development | Radiation Survey - sampling rate error | When attempting to perform the radiation
survey, the program displayed an error at
startup stating that the software was not |
|
139
|
Monday, March 21, 2022, 13:14 |
Adam Newsome | Trolley | Repair | Video Trolley Mk 1 - Radial Limit Switch Replacement | An issue was observed in which radial motion
on the Video Trolley Mk 1 did not respond
to commands. After troubleshooting, it was |
|
140
|
Wednesday, April 27, 2022, 16:05 |
Adam Newsome | Cyclotron | Standard Operation | Lid down operation - 2022 | The lid down operation
took place on Apr. 27, 2022. |
|
141
|
Wednesday, May 04, 2022, 12:07 |
Adam Newsome | Trolley | Development | Tool Trolley: Brass air fittings replacement complete | All of the old brass air fittings on the
Tool Trolley have now been swapped over to
push-connect style fittings. As these are |
|
145
|
Wednesday, June 29, 2022, 12:12 |
Adam Newsome | Probe | Development | LE1/LE2 Probe Frame - Updates | The LE1/LE2 Probe Frame was mounted on
the Upper Resonator Trolley in the mockup
with the intention of confirming functionality |
|
146
|
Thursday, October 06, 2022, 17:15 |
Adam Newsome | Elevation Jack | Maintenance | Preventative Maintenance: MCC-E elevating system motor contactors | Under work permit C2022-10-04-1,
the motor contactors for jack motors 1 through
12 were replaced. The contactors showed signs |
|
147
|
Friday, January 27, 2023, 12:12 |
Adam Newsome | Infrastructure | Development | Vault crane - inspection, remote pendant installation | The vault crane annual inspection was completed
by Tom Kauss.
|
|
148
|
Monday, January 30, 2023, 12:20 |
Adam Newsome | Cyclotron | Standard Operation | Lid up operation - 2023 | The lid up operation
took place on Jan. 30, 2023. |
|
152
|
Friday, March 31, 2023, 13:22 |
Adam Newsome | Cyclotron | Standard Operation | Lid down operation - 2023 | The lid down operation
took place on Mar. 31, 2023. |
|
153
|
Wednesday, April 26, 2023, 11:19 |
Adam Newsome | Cyclotron | Standard Operation | Vault Shield Door Closed | The vault shield door has been closed and
seal inflated. The operation was performed
with no issue. |
|
154
|
Friday, July 28, 2023, 12:05 |
Adam Newsome | Cyclotron | Development | Maintenance ladders: end caps added | The original end feet and end caps were
removed from the maintenance ladders and
replaced by new end caps (TRH1637). |
|
155
|
Thursday, August 03, 2023, 10:43 |
Adam Newsome | Trolley | Development | Previous generation video trolley decommissioned | The "old" video trolley featuring
scissor mechanism and DSLR camera has officially
been decommissioned. Going forward, Video |
|
157
|
Thursday, September 14, 2023, 13:51 |
Adam Newsome | Trolley | Maintenance | Lift Trolley: upgrades to camera tilt mechanism | The two camera tilt mechanisms on the lift
trolley have been upgraded. Upgrades include:
For the individual camera: |
|
158
|
Friday, September 15, 2023, 10:15 |
Adam Newsome | Trolley | Maintenance | Lift Trolley: mirror actuation mechanism repair/upgrade | The mirror actuation mechanism was observed
to be "sticky" during 2023 winter
shutdown - it occasionally did not function |
|
162
|
Tuesday, January 23, 2024, 14:03 |
Adam Newsome | Elevation Jack | Maintenance | Inspection of elevating system motor contacts | Motor contactors for the cyclotron elevating
system jacks were inspected on 2025-01-23
by Joel Semilla under work permit C2024-01-19-1. |
|
163
|
Wednesday, January 31, 2024, 11:39 |
Adam Newsome | Elevation Jack | Maintenance | Jack station 11: synchro replaced | Because of observed noise on the synchro
at jack station 11 during recent shutdown
lid up/down operations, the synchro at this |
|
165
|
Wednesday, February 07, 2024, 12:04 |
Adam Newsome | Elevation Jack | Repair | Elevating system - brake master relay fuse issue | It was observed when attempting lid up
operation on 2024-02-06 that the brakes for
each of the jacks were not operating correctly. |
|
166
|
Thursday, February 08, 2024, 08:50 |
Adam Newsome | Elevation Jack | Maintenance | Elevating system - station 10 motor contactor issue | It was observed during lid up operation
on 2024-02-08, approximately halfway through
raising the lid, that the motor contactor |
|
167
|
Friday, February 09, 2024, 15:43 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation - 2024 | The cyclotron lid was raised starting ~10:30am
on 2024-02-06 and finishing at ~3:30pm on
2024-02-08, under work permit C2024-02-06-4. |
|
168
|
Friday, February 16, 2024, 11:11 |
Adam Newsome | Trolley | Repair | Lift Trolley: vertical motion failure, motor relays replaced | Today (2024-02-16) when operating the lift
trolley to install shields in the cyclotron,
the vertical motion was observed to be intermittently |
|
169
|
Monday, February 26, 2024, 11:52 |
Adam Newsome | Cyclotron | Repair | Controls issue - CAMAC power supply | An issue was encountered on 2024-02-23
when attempting to operate the lift trolley.
|
|
170
|
Friday, April 19, 2024, 15:18 |
Adam Newsome | Cyclotron | Standard Operation | Lid down operation - 2024 | The lid down operation
took place on April 19, 2024. |
|
171
|
Wednesday, April 24, 2024, 14:26 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation (second) - 2024 | Due to an issue with resonator latching,
there was a need to raise the cyclotron lid
a second time this shutdown. |
|
172
|
Tuesday, April 30, 2024, 15:00 |
Adam Newsome | Cyclotron | Standard Operation | Lid down operation (second) - 2024 | A second lid down
operation took place on April 30, 2024. |
|
173
|
Thursday, May 02, 2024, 12:42 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation (third) - 2024 | The cyclotron lid was raised starting ~11:45am
on 2024-05-02 and finishing at ~12:12pm
under work permit C2024-05-02-5. |
|
174
|
Tuesday, May 07, 2024, 09:35 |
Adam Newsome | Elevation Jack | Standard Operation | Lid down operation (third) - 2024 | A third lid down
operation took place over May 6-7, 2024. |
|
185
|
Wednesday, July 17, 2024, 15:02 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels | A safety walkaround for July 2024 was completed
for the B1 and B2 levels by A. Newsome, and
for the main shop and back shop by R. Sykes. |
|
187
|
Wednesday, July 24, 2024, 11:39 |
Adam Newsome | Cyclotron | Standard Operation | Investigation of faulty Al-ALCW signal | Fault 16710 was initially assigned
to Remote Handling: |
|
190
|
Thursday, October 10, 2024, 12:30 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels | A safety walkaround was completed for the
RH Shop, Back Shop, B1, and B2 levels.
The resulting spreadsheet can be |
|
191
|
Wednesday, October 16, 2024, 11:37 |
Adam Newsome | Service Bridge | Development | Bridge Lift Mechanism Refurbishment (Phase 2 of 2) - Complete | See previous e-log for phase 1: e-log
134
|
6x |
192
|
Friday, January 03, 2025, 10:20 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Building B1 and B2 Level | A safety walkaround was completed for the
RH building B1 and B2 levels.
The resulting spreadsheet can be |
|
193
|
Monday, January 06, 2025, 13:57 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Building Shop and Back Shop | A safety walkaround was completed for the
RH building shop and back shop.
The resulting spreadsheet can be |
|