Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-Cyclotron
Not logged in
List
Message ID:
131
Entry time:
Thursday, April 01, 2021, 13:47
Author:
Adam Newsome
Category:
Cyclotron
Type:
Standard Operation
Subject:
Vault Shield Door Closed
The vault shield door has been closed and seal inflated. The operation was performed with no issue.
ELOG V2.9.2-2455