The seven copper blockers were removed from the Cyclotron tank by the RH group using the service bridge, lift
trolley, and attached checklist on 2017-01-30.
The monitor box (NE/SW-5/8/10) and series 200, 400, 500, 600, and 700 shields were installed in the Cyclotron
tank by the RH group using the service bridge, lift trolley, and attached checklist on 2017-01-31 and 2017-02-
01.
The seven port hole covers were installed in the Cyclotron tank by the RH group using the service bridge, tool
trolley, and vacuum unit on 2017-01-02.
The two ladders were installed in the Cyclotron tank by the RH group using the service bridge, lift trolley,
and ladder attachment on 2017-01-02.
=================================================================================================================
The monitor box (NE/SW-5/8/10) and series 200, 400, 500, 600, and 700 shields were removed from the Cyclotron
tank by the RH group using the service bridge, lift trolley, and attached checklist on 2017-03-07 and 2017-03-
08.
The seven port hole covers were removed and the Cyclotron tank seal was cleaned by the RH group using the
service bridge, tool trolley, and vacuum unit on 2017-03-09.
The two ladders were removed from the Cyclotron tank by the RH group using the service bridge, lift trolley,
and ladder attachment on 2017-03-09.
The seven copper blockers were installed in the Cyclotron tank by the RH group using the service bridge, lift
trolley, and attached checklist on 2017-03-09. |