Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 51     Entry time: Wednesday, January 28, 2015, 14:33
Author: Travis Cave 
Category: Cyclotron 
Type: Standard Operation 
Subject: Day two of in tank work 

All copper blocker removed from the cyclotron and first radiation survey done. Shields start tomorrow.

ELOG V2.9.2-2455