Message ID: 125     Entry time: Monday, November 09, 2020, 09:17
Author: Adam Newsome 
Category: Infrastructure 
Type: Development 
Subject: New crane pendant: B2 level crane 

A new remote crane pendant was installed to replace the existing wired pendant on the B2 level of Remote Handling building (basement area - vault access). Two remote pendants exist (spare). The previously used pendant will be kept, at least temporarily, as a backup if needed.

The pendant was installed by M. Faragher, and tested by M. Faragher and T. Cave. It is fully functional.

TRIUMF Work Request 5684 describes the upgrade in more detail.