Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 94     Entry time: Tuesday, February 21, 2017, 13:40
Author: Isaac Earle 
Category: Cyclotron 
Type: Standard Operation 
Subject: HE2 Probe Returned to Cyclotron 

 The HE2 probe was reinstalled in the cyclotron this morning following the procedure in Document #126165.  An orbital bridge position of 247.35° was used (same as for the removal on Feb 9th).  The installation went smoothly.

ELOG V2.9.2-2455