Message ID: 64     Entry time: Thursday, March 26, 2015, 15:48
Author: Grant Minor 
Category: Elevation Jack 
Type: Standard Operation 
Subject: Cyclotron Lid-Up 26 March 2015 

Lid was raised today (2nd time during 2015 shutdown) for additional inflector work.

Dan and Maico report that the lid went up smoothly and no jogs were required.  The operation took about 30 minutes.

- Grant