Message ID: 185     Entry time: Wednesday, July 17, 2024, 15:02
Author: Adam Newsome 
Category: Infrastructure 
Type: Standard Operation 
Subject: Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels 

A safety walkaround for July 2024 was completed for the B1 and B2 levels by A. Newsome, and for the main shop and back shop by R. Sykes.

Results can be found in the master spreadsheet

 

Major deficiencies, main shop:

  • Unpainted lead bricks need to be picked up. This was requested of mechanical services twice already in July 2024. Follow up next inspection if not removed.
  • Nearly half bulbs burnt out - enough to warrant replacement. AN requested of electrical services on 2024-07-17. Follow up next inspection if not replaced.

 

Major deficiencies, back shop:

  • Phone not working. AN created help ticket 2024-7-17. Follow up next inspection.

 

Minor deficiencies, B1 level:

  • 4-5 light bulbs will need to be replaced soon, not urgent yet.

 

Major deficiencies, B2 level:

  • On the outboard support frame, the lifting eye fastener was stripped which prevented the nut from tightening all the way, posing a rigging hazard. The damaged lifting eye was replaced with a working one 2024-07-15.
  • Light fixture above bootbox - mounting damaged and hanging precariously. Reported to electrical services 2024-07-15 and informed common users of area.
    Update 2024-07-17 - the issue has been resolved.
  • Probes group has rad-waste in the middle of the floor. Reminded them to dispose of it soon.