Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 33     Entry time: Thursday, January 30, 2014, 13:47
Author: Travis Cave 
Category: Cyclotron 
Type: Standard Operation 
Subject: shields 

All shields, pothole covers, and ladders have been installed into the cyclotron.

ELOG V2.9.2-2455