Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 147     Entry time: Friday, January 27, 2023, 12:12
Author: Adam Newsome 
Category: Infrastructure 
Type: Development 
Subject: Vault crane - inspection, remote pendant installation 

The vault crane annual inspection was completed by Tom Kauss.

 

The wired pendant was replaced with a remote pendant by Tom Kauss.

ELOG V2.9.2-2455