Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 179     Entry time: Friday, May 31, 2024, 12:47
Author: Riley Sykes 
Category: Trolleys serviced 
Type: Maintenance 
Subject: Tool Trolley Scheduled Maintenance 

 60 month service completed. Bearings for drive motor wheels regreased, Reducer repacked with Molub Alloy 777-1 ES, all mechanically sound. Recommended to swap out front right drive wheel in 5 years due to minimal deteoration.

Attachment 1: Tool_Trolley_Drive_Motor.jpg  85 kB  | Show | Hide all
ELOG V2.9.2-2455