Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 58     Entry time: Friday, March 06, 2015, 14:38
Author: Travis Cave 
Category: Cyclotron 
Type: Standard Operation 
Subject: Shield Removal 

All shields and ladders have been removed from the tank, all the port holes have been uncovered, the tank seal has been vacuumed, and the copper blockers installed into the cyclotron.

ELOG V2.9.2-2455