Lid up (Attempt #1)

Pre-indexed 

Start @ 2017-01-25 13:05
End   @ 2017-01-25

Master   56

Jack #01 00117 to ABORTED OPERATION
Jack #02 00123 to ABORTED OPERATION
Jack #03 00119 to ABORTED OPERATION
Jack #04 00114 to ABORTED OPERATION
Jack #05 00118 to ABORTED OPERATION
Jack #06 00121 to ABORTED OPERATION
Jack #07 00118 to ABORTED OPERATION
Jack #08 00118 to ABORTED OPERATION
Jack #09 00115 to ABORTED OPERATION
Jack #10 00120 to ABORTED OPERATION
Jack #11 00117 to ABORTED OPERATION
Jack #12 00110 to ABORTED OPERATION


Lid up (Attempt #3)

Start @ 2017-01-26 14:51
End   @ 2017-01-26 15:15

Master   -18 to 47365

Jack #01 00049 to 47335
Jack #02 00049 to 47332
Jack #03 00045 to 47337/41
Jack #04 00047 to 47334
Jack #05 00049 to 47341
Jack #06 00049 to 47343
Jack #07 00050 to 47348
Jack #08 00046 to 47324
Jack #09 00049 to 47348
Jack #10 00050 to 47346
Jack #11 00052 to 47334/6
Jack #12 00051 to 47341

Metre stick: 2 mm from vault ceiling
The Highfield input shaft on 10L was louder than the other stations while raising the lid.


Lid down

Start @ 2017-03-09 14:44
End   @ 2017-03-09 15:25
Master   47365 to 00040
Jack #01 47335 to 00045
Jack #02 47332 to 00043
Jack #03 47337 to 00042
Jack #04 47334 to 00044
Jack #05 47341 to 00044
Jack #06 47343 to 00044
Jack #07 47348 to 00045
Jack #08 47324 to 00043
Jack #09 47348 to 00044
Jack #10 47346 to 00046
Jack #11 47334 to 00048
Jack #12 47341 to 00045