Message ID: 62     Entry time: Tuesday, March 17, 2015, 13:04
Author: maicodallavalle 
Category: Cyclotron 
Type: Maintenance 
Subject: Upper Bearings Station #5 and #10 

The Upper bearings on Station #5 and Station #10 have been serviced. The Upper Bearing were disassembled. The old gear was removed and wiped clean. All parts were inspected.All parts were greased and then reassembled.All Fall Protection Platform railing was collapsed on both stations #5and #10.