Message ID: 93     Entry time: Thursday, February 09, 2017, 15:21
Author: Isaac Earle 
Category: Cyclotron 
Type: Standard Operation 
Subject: HE2 Probe Removed 

 The HE2 probe was removed from the cyclotron today following the procedure in Document #126165.  An orbital bridge position of 247.35° provided better alignment than 247.2 from the procedure.  The probe signal head was intentionally left in the "up" position by Diagnostics Group which did not cause any issues with removal.  Trolley elevation when the frame contacted the base of the probe was 53.8".  No major issues were encountered. The probe will be returned to the tank of Diagnostics Group have converted the radial drive to a bellows feedthru.

 

 