Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-Cyclotron
Not logged in
List
Message ID:
136
Entry time:
Wednesday, January 19, 2022, 09:50
Author:
Travis Cave
Category:
Shielding
Type:
Standard Operation
Subject:
Shield door is now open
The shield door is now open on the RH B2 level.
ELOG V2.9.2-2455