Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 79     Entry time: Friday, February 05, 2016, 14:57
Author: Travis Cave 
Category: Service Bridge 
Type: Maintenance 
Subject: outrigger problem 

outrigger 1 had a power failure, bridge was removed power restored and outrigger parked, outrigger will be looked at once the shield are done hopefully.

ELOG V2.9.2-2455