Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 32     Entry time: Wednesday, January 29, 2014, 15:08
Author: Bevan Moss 
Category: Cyclotron 
Type: Standard Operation 
Subject: Shielding and Port Hole Covers 

 The Shielding and the Port Hole Covers have all been installed. No issues with the installation have caused any problems. This orbit, radial, and vertical read back continues to be an issue.

ELOG V2.9.2-2455