Message ID: 150     Entry time: Friday, February 03, 2023, 08:27
Author: Eric Lahe 
Category: Elevation Jack 
Type: Maintenance 
Subject: Elevating System Jack Inspection  

 Annual Jack Inspection: The annual elevation system inspection has been completed (Jan 31,2023).

 

At station 1, Highfield gear Jack 13R needs a coupler seal replacement. It is ok for this shutdown, but should be replaced before next shutdown.

During the lift, station 7, Right Highfield was running a little rough - should also be checked before next shutdown. 

 

All motor and gearbox temperatures recorded during lift were consistent to temperatures recorded in the past. 

The full service to two jacks are not being completed this year. 