This is a list of all the trolleys and other equipment witch were checked and serviced prior to work in the Cyclotron.
- Video Trolley cleaned and checked (no adjustments needed)
-Lift Trolley cleaned and checked (no adjustments needed)
- Left Outrigger cleaned and checked
All of the bearings in the festooning wheels were changed.
Drive chain needed adjustment. (modification to wheel mounting bracket so that chain could be adjusted)
-Right Outrigger cleaned and checked
All of the bearings in the festooning wheels were changed.
Drive chain needed adjustment. (modification to wheel mounting bracket so that the chain could be adjusted)
-Tool Trolley cleaned and checked
One of the support wheels was checked and found to be out of alignment. (an adjustment was made to correct the problem)
-Upper Resonator Trolley cleaned and checked (no adjustments needed)
-Service Bridge cleaned and checked
Center post mount was rotated by hand. (no adjustment needed)
-Service Bridge Carrier cleaned and checked
The two hydraulic cylinders witch lift the Service Bridge into the Cyclotron leaked last year.They were rebuilt last year and are not leaking.
The two drive chains witch run the Carrier North and South were found to be too tight. (an adjustment was made to correct the problem)
|